100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

CDC 3E251 VOLUME 4 EXAM WITH COMPLETE QUESTIONS AND VERIFIED ANSWERS

Puntuación
-
Vendido
-
Páginas
10
Grado
A+
Subido en
07-08-2024
Escrito en
2024/2025

CDC 3E251 VOLUME 4 EXAM WITH COMPLETE QUESTIONS AND VERIFIED ANSWERS...

Institución
CDC 3E251 VOLUME 4
Grado
CDC 3E251 VOLUME 4









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CDC 3E251 VOLUME 4
Grado
CDC 3E251 VOLUME 4

Información del documento

Subido en
7 de agosto de 2024
Número de páginas
10
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CDC 3E251 VOLUME 4 EXAM WITH COMPLETE
QUESTIONS AND VERIFIED ANSWERS


Which special capes team(s) concentrate on doing airfield repairs when opening the
airbase? - ANSWER Contingency Response Group (CRG) and Red Horse

After airfield repairs and opening the base for operations, which unit will take over
to continue airfield repairs? - ANSWER Prime BEEF

Which rapid runway repair (RRR) equipment set enables the completion of AT
LEAST 6 craters within 4 hours? - ANSWER R-2

Of the rapid runway repair (RRR) equipment sets, which one is a supplemental kit
capable of repairing 12 craters in 4 hours? - ANSWER R-3

Which pavement damage is caused by general-purpose bombs in the 100-pound
class and delay-fused munitions? - ANSWER Large crater

What are the typical dimensions for the minimum operating strip (MOS) for
tactical aircraft (fighters)? - ANSWER 50x5,000 ft.

What type of crater repair do we make to upgrade expedient repairs? - ANSWER
Sustainment

Airfield sustainment repairs are an upgrade to the expedient repairs and are
designed to support how many passes as compared to the expedient's 100 passes. -
ANSWER 5,000

After a conflict is over, what type of repairs are designed to turn the airbase to its
original condition? - ANSWER Permanent

When an enemy attack becomes imminent, the rapid runway repair (RRR) assets
MUST be - ANSWER Equally divided and dispersed to pre-designated areas

Which piece of heavy equipment should lead the way to clear debris from the
convoy route? - ANSWER Loader

How many expedient crater repair methods are used by the Air Force? - ANSWER
Seven

, Which equipment do we use in conjunction with a front-mounted broom to clear an
area where prefabricated surface mats are to be assembled? - ANSWER Grader

Which task must start the same time the loader is clearing the crater and the grader
is clearing the minimum operating strip (MOS) and taxiway locations? - ANSWER
Load and haul teams

Who determines how much fill material is needed at the crater repair sites? -
ANSWER Crater NCOIC

Where is the ideal place for the dozers to be downloaded? - ANSWER Side of the
crater closest to the minimum operating strip (MOS) edge

What is the FIRST action you take if it becomes necessary to repair a broken pipe
or cable located in a crater? - ANSWER Isolate the damaged utility

During upheaval removal the crater edge needs to be as vertical as possible and
how many inches deep - ANSWER 18 to 24

During the debris backfill method of crater repair, how many inches in diameter
will the debris be allowed to be pushed back into the crater? - ANSWER 12

What is the LAST step in the airfield damage repair (ADR) process before flying
operations can begin? - ANSWER Sweeping operations

During legacy spall repair, which method has a cure time of 20 minutes requiring
frequent cleaning of the mixer and hand tools? - ANSWER Fast-setting Portland
cement

Fast-setting Portland cement has an approximate cure time of twenty minutes, what
can this cure time be extended to during colder temperatures? - ANSWER 2 hours

Before you can use any material on Department of Defense (DOD) airfields, you
MUST make sure it - ANSWER Is certified for use

Using the new rapid airfield damage repair (RADAR) techniques, how many small
craters can be repaired within a 6 1/2 hour time span? - ANSWER 120

Which stage is considered the 3E2's primary tasking during advanced crater repair?
- ANSWER Damage Repair
$13.09
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Mirror Liberty University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
385
Miembro desde
2 año
Número de seguidores
137
Documentos
4584
Última venta
13 horas hace

3.9

54 reseñas

5
21
4
17
3
8
2
3
1
5

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes