100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

LSU CM EXIT EXAM 2024/2025 WITH 100% ACCURATE SOLUTIONS

Puntuación
-
Vendido
-
Páginas
16
Grado
A+
Subido en
06-08-2024
Escrito en
2024/2025

LSU CM EXIT EXAM 2024/2025 WITH 100% ACCURATE SOLUTIONS

Institución
LSU CM EXIT
Grado
LSU CM EXIT










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
LSU CM EXIT
Grado
LSU CM EXIT

Información del documento

Subido en
6 de agosto de 2024
Número de páginas
16
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

LSU CM EXIT EXAM 2024/2025 WITH
100% ACCURATE SOLUTIONS


The difference between a current asset and a long term asset is
______________ - Precise Answer ✔✔Current assets can be liquidated
within one year and long term assets cannot


Current Ratio - Precise Answer ✔✔This accounting ratio is calculated
by dividing the total current assets by the total current liabilities


Working capital of a construction company increases when - Precise
Answer ✔✔A company sells equipment or assets


When an owner decides to add additional work to the original scope, this
is considered what type of change? - Precise Answer ✔✔Owner
Directed Change Order


All of the following are steps that a construction company can follow in
applying risk management except one. - Precise Answer ✔✔Avoid all
risky situations.


Complete the risk statement...if a/an _______________ happens, then
the steel material for the project may cost more than the budget, which
will impact the stele subcontractors, causing an increase in the project
cost. - Precise Answer ✔✔Fluctuation in the steel price.

,Which of the following best describes risk? - Precise Answer ✔✔The
potential event that results in an outcome that is different than what's
planned.


Typical steps associated with the risk management process are identify
the risk, analyze the identified risks, _____________, allocate risks
contractually, and monitor and control risks throughout the design and
construction of a project. - Precise Answer ✔✔Mitigate and plan to
address risks.


Which of the following is not a risk identification tool and technique that
construction managers use. - Precise Answer ✔✔Value Engineering


Change Order - Precise Answer ✔✔A written order to the contractor
authorizing changes in work to the signed original documents (not the
bid documents)


An acceptance is ______________________________. - Precise
Answer ✔✔An unconditional agreement with an offer


What is the constructive acceleration? - Precise Answer ✔✔It is the
forced completion of the contract work in a shorter period than should
have been allowed by the issuance of a warranted time extension.


What is the cardinal rule of documentation and records? - Precise
Answer ✔✔Put it in writing.

, Which one of the following is NOT an alternative dispute resolution
method? - Precise Answer ✔✔Litigation


__________________ is a sum withheld from progress payments to the
contractor in accordance with the terms of
the contract - Precise Answer ✔✔Retainage (retention)


Define progress curves. - Precise Answer ✔✔A display of cumulative
costs, labor hours, or other quantities against time as s-curves.


From the following list, which tool does not help a project manager to
control costs on a project? - Precise Answer ✔✔Baseline schedules


If a project that is 40% complete has a cost variance of -$45,000, what
does this mean? - Precise Answer ✔✔The project is currently $45,000
over-budget


In earned value, if a project has a BCWP equal to $5,000, what does the
$5,000 represent? - Precise Answer ✔✔The Earned Value of the Project


Which one of the following would a project manager not find the
information needed to calculate and plot the ACWP for an earned value
analysis? - Precise Answer ✔✔Three-week look ahead schedule
$16.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
YANCHY Herzing University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1739
Miembro desde
3 año
Número de seguidores
1159
Documentos
23166
Última venta
5 días hace
Ace Your Exams with Elite Study Resources | ExamEliteHub on Stuvia

I offer genuine and dependable exam papers that are directly obtained from well-known, reputable institutions as a highly regarded professional who specializes in sourcing study materials. These papers are invaluable resources made to help people who want to become nurses and people who work in other fields prepare for exams. Because of my extensive experience and in-depth knowledge of the subject, I take great care to ensure that each exam paper meets the highest quality, accuracy, and relevance standards, making them an essential component of any successful study plan.

Lee mas Leer menos
4.1

447 reseñas

5
251
4
58
3
85
2
18
1
35

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes