100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

CQM-C Questions With Correct Answers Grade A+

Puntuación
-
Vendido
-
Páginas
3
Grado
A+
Subido en
31-07-2024
Escrito en
2023/2024

The purpose of Construction Quality Management is to: -ANSWER-Achieve the quality established by properly developed requirements through the combined responsibility, but seperate efforts of contractpr smd government personnel. Construction Quality Management is the performance of tasks, which ensure that construction is performed. -ANSWER-According to plans and specifications, on time, within a defined budget and a safe work environment. Partnering relationships are based upon: -ANSWER-Building trust and dedication to common goals It is the responsibility of Quality Assurance Personnel to: -ANSWER-Periodically verify that the contractors system of control is working effectively. An effective contractor quality control program will: -ANSWER-Be an incentive for work to be done correctly the first time resulting in earlier completion, reduced field overhead costs, and greater profits. The success or failure of all contractors is based upon: -ANSWER-The ability to control costs, finance work, estimate jobs, schedule the work, and maintain effective quality control. Quality Assurance Personnel have the responsibility to: -ANSWER-Require contractors to maintain the quality specified in the plans and specifications. Inspection is: -ANSWER-The process by which ongoing and completed work is examined During the punch-out inspection of a project: -ANSWER-Quality Assurance Personnel must assure that the contractor prepares a punch-list and makes corrections. If there is a disagreement whether the contractors work complies with the contract: -ANSWER-The government makes the final determination Characteristics that describe a definable feature of work include: -ANSWER-Cross-referenced listings to the contractors construction schedule that may have more than one definable feature under a section of the specifications. The _____________________ consists of daily checks of the work to assure continuing compliance with contract requirements. -ANSWER-Follow-up phase

Mostrar más Leer menos
Institución
CQM-C
Grado
CQM-C








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CQM-C
Grado
CQM-C

Información del documento

Subido en
31 de julio de 2024
Número de páginas
3
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$11.39
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
daltonvicky

Conoce al vendedor

Seller avatar
daltonvicky West Virginia university
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
8
Miembro desde
1 año
Número de seguidores
2
Documentos
446
Última venta
9 meses hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes