100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Otro

Environmental Impact Assessment: Scoping Report

Puntuación
-
Vendido
-
Páginas
49
Subido en
10-07-2024
Escrito en
2022/2023

A scoping report of an Environmental Impact Assessment (EIA) outlines the proposed project's scope, key environmental issues, and assessment boundaries. It identifies potential impacts on various environmental and socio-economic factors and details the methodology for further study. The report also includes stakeholder input and outlines the next steps in the EIA process, including detailed impact assessments and mitigation strategies.

Mostrar más Leer menos
Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Estudio
Desconocido
Grado

Información del documento

Subido en
10 de julio de 2024
Número de páginas
49
Escrito en
2022/2023
Tipo
Otro
Personaje
Desconocido

Temas

Vista previa del contenido

University of Southampton




Development Scenario: Scoping Report for the Itchen Royal Marina
in Southampton, England.




GROUP 5:
Freya Patten (30821207), Isabelle Skillan (31206298), Tate Willing (30879906),

Lele Zhang (30930723), Lydia Maher (29848342), Archie Hulse (29400333)


ENVS2006 Environmental Impact Assessment
Dr. Malcolm D Hudson


Word Count: 4224
19th April 2021

,CONTENTS
1 Introduction
1.1 Overview of the Proposed Project
1.2 Purpose of Scoping Report
1.3 Development Site
1.4 Project Proposal
1.5 Specification of Development
1.6 Diagram and Map of Proposed Development Site
2 Geology and Soils
2.1 Introduction
2.2 Legislation and Policy Content
2.3 Existing Baseline
2.4 Project Impacts
2.5 Proposed Scope and Methodology of the Assessment

3 Groundwater
3.1 Introduction
3.2 Legislation and Policy Content
3.3 Existing Baseline
3.4 Project Impacts
3.5 Proposed Scope and Methodology of the Assessment

4 Aquatic Life and Surface Water
4.1 Introduction
4.2 Legislation and Policy Content
4.3 Existing Baseline
4.4 Project Impacts
4.5 Proposed Scope and Methodology of the Assessment

5 Terrestrial Life
5.1 Introduction
5.2 Legislation and Policy Content
5.3 Existing Baseline
5.4 Project Impacts
5.5 Proposed Scope and Methodology of the Assessment

6 Air Quality Local
6.1 Introduction
6.2 Legislation and Policy Content
6.3 Existing Baseline
6.4 Project Impacts
6.5 Proposed Scope and Methodology of the Assessment

7 Air Quality Global
7.1 Introduction
7.2 Legislation and Policy Content
7.3 Existing Baseline
7.4 Project Impacts
7.5 Proposed Scope and Methodology of the Assessment
8 Nuisance

,8.1 Introduction
8.2 Legislation and Policy Content
8.3 Existing Baseline
8.4 Project Impacts
8.5 Proposed Scope and Methodology of the Assessment

9 Heritage
9.1 Introduction
9.2 Legislation and Policy Content
9.3 Existing Baseline
9.4 Project Impacts
9.5 Proposed Scope and Methodology of the Assessment

10 Socio-economic
10.1 Introduction
10.2 Legislation and Policy Content
10.3 Existing Baseline
10.4 Project Impacts
10.5 Proposed Scope and Methodology of the Assessment

11 Health and Safety
11.1 Introduction
11.2 Legislation and Policy Content
11.3 Existing Baseline
11.4 Project Impacts
11.5 Proposed Scope and Methodology of the Assessment
12 Landscape
12.1 Introduction
12.2 Legislation and Policy Content
12.3 Existing Baseline
12.4 Project Impacts
12.5 Proposed Scope and Methodology of the Assessment

13 Conclusion
13.1 Scoping in and Scoping Out Summary
13.2 Consultation
13.3 References

, 1 INTRODUCTION

1.1 Overview of the Proposed Development

1.1.1 This scoping report is produced on behalf of the Southampton City Council ’s (SCC) redevelopment plans of
Kemps Quay Marina (KQM) and Itchen Ferry boatyard in Southampton, England.

1.2 Purpose of Scoping Report

1.2.1 The report aims to scope and assess the environmental impacts associated with the redevelopment
proposal of the Marina, within the Environmental Impact Assessment (EIA) process.

1.2.2 EIA is directed by the EU 85/337/EEC directive, amended by 2017 regulations, to assess the significant
environmental effects a public or private project will have on an area.

1.2.3 This scoping report will determine the possible impacts and alternatives of the Kemps Quay Marina and
Itchen Ferry Boatyard redevelopment proposal to be further used in the EIA process.



1.3 Development Site

1.3.1 KQM redevelopment is located on the southern coast of England, in Southampton, Hampshire.

1.3.2 The Marina has main access from Quayside Road with bus stops and routes located opposite the marina,
and a main A road (A3024) runs adjacent through to the City.

1.4 Project Proposal

1.4.1 A new marina development, to expand KQM and the Itchen Ferry Boatyard in Southampton is proposed. It
aims to regenerate the current site for residential and maritime purposes, including improving docking
and vessel accessibility.

1.5 Specification of Development

1.5.1 Site On the shore of the River Itchen, Southampton
with access from Quayside Road grid ref
SU443127

Residential 40 luxury waterside apartments, in blocks three storeys high
Moorings & pontoon Up to 350 vessels depending on size (up to 45ft and 2m draft). Some dredging
berthing will be necessary to a depth of 2.5m for access to pontoons by larger vessels.
Maritime Services Electricity, water, and refuelling; dry stack storage, winter layup onshore, wash
down & general servicing facilities including refits and antifouling, lifts for
vessels.
General facilities Toilets, shop, and social club; reception and office.
Operation time Long Term. This is intended as a long-term project including residences:
decommissioning is not envisaged, although technological improvements may
necessitate minor upgrades to facilities in the future.
Mitigation Businesses which have active leases will be compensated.
Under a planning agreement, a City Council nature conservation warden will be
funded by the developers to oversee management of the Chessel Bay reserve.
Positive management (habitat restoration, access improvements, litter picking,
community support) will be included in the site environmental management plan.
$7.73
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
freyaelizabeth

Conoce al vendedor

Seller avatar
freyaelizabeth University of Law
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
1 año
Número de seguidores
0
Documentos
20
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes