100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

CM 1011 Notes Laison Gilbert Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

Puntuación
-
Vendido
-
Páginas
8
Grado
A+
Subido en
26-06-2024
Escrito en
2023/2024

CM 1011 Notes Laison Gilbert Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

Institución
Grado









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

Subido en
26 de junio de 2024
Número de páginas
8
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CM 1011 Notes Laison Gilbert
Commercial construction includes: - ANS-Bank, schools, Hotels, Shopping malls, Government
buildings.
F. ALL OF THE ABOVE

Who are the primary players in a construction project? - ANS-Owners,
Design Professionals,
Construction Professionals

What is the name of the weekly magazine dedicated solely to the construction industry? -
ANS-Engineering News Record (ENR)

By whom was the first form of concrete used? - ANS-Romans

Sub-contractors, sub-sub-contractors and sub-sub-sub-contractors under the prime contractor
are entities that directly affect the project and are classified as: - ANS-1st Level of the
Secondary Players

An onsite safety plan should cover any and all possible safety problems inherent with the type of
construction at that site. This is part of: - ANS-Managing Safety

Many construction companies will rotate their new hires through a number of tracks. The entry
level in the field track is the: - ANS-Field Engineer

What sums up the role of an Area Superintendent? - ANS-Assists the Project Superintendent on
large projects

The primary materials used in commercial construction include: - ANS-steel, concrete, glass,
marble, granite, acoustic ceilings.
ALL OF THE ABOVE

What is lean construction? - ANS-Philosophy that focuses on adding value with less work and
the elimination of waste in the building process.

Which of the following is terminology used regarding the in-office work done by the contractor to
assist the actual construction work done in the field? - ANS-Administering the Contract

All of the following are functions of Construction Management except:
A.Financing the project
B.Planning the project
C.Scheduling the project

, D.Estimating the project - ANS-A. Financing the project

Because of early involvement of the construction entity with the planning phase, these two
project delivery methods are similar:
A. Design/build and at-risk CM
B. Design /bid/build and at-risk CM
C. Design/build and Design /bid/build - ANS-A. Design/Build and at-risk CM

Who determines what method of delivery is used on a project? - ANS-Owner

The factors to consider when choosing the delivery method include: - ANS-Cost, time, quality,
design, risk-tolerance, and Owner construction expertise

Which of the following is terminology used regarding used regarding the onsite work done by
the contractor? - ANS-Managing Construction Operations

An estimate is a best-guess of the costs of materials, equipment, and labor to the contractor to
do the project and it includes:
A.General overhead items
B.Profit
C.General overhead items and profit
D.None of the above - ANS-D. None of the above

Which is not a part of the three legged stool of construction?
A.Time
B.Cost
C.Quality
D.Efficiency - ANS-D. Efficiency

The written instructions from an architect or engineer accompanying the project plans pertaining
to the quality of materials and workmanship required for the project is: - ANS-Specifications

A project delivery method in which the owner holds two separate contracts for design and
construction is: - ANS-Design-bid-build method

Which of the following contract types is most popular with design-build project delivery? -
ANS-Cost-plus-fee

What is the tool used to reduce the number of bidders on a public project and to increase the
quality of the contractor pool? - ANS-Prequalification

What is the name of a notification sent to a selected list of contractors, furnishing information on
the submission of bids on a private project? - ANS-invitation for bids
$7.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
DoctorHkane Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
732
Miembro desde
4 año
Número de seguidores
168
Documentos
22458
Última venta
1 día hace

Explore my Stuvia collection for essential study aids: test banks, exams, summaries, and cases. With five years of expertise as an academic writer, I have honed my skills in crafting top-notch essays, exams, and research dissertations. My proficiency lies in producing well-structured and thoroughly researched content that meets academic standards. I am adept at handling various subjects and ensuring a seamless flow of ideas. Whether it's delivering compelling arguments in essays, creating challenging yet fair exam questions, or delving into in-depth research for dissertations, my experience equips me to excel in diverse academic writing tasks. I pride myself on meeting deadlines and maintaining the highest quality in every piece I produce. REACH ON iamnjokikelvin1@gmail

Lee mas Leer menos
4.6

386 reseñas

5
308
4
29
3
21
2
10
1
18

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes