CAPM Practice Test 150 Questions & Answers 100% ACCURATE!!

Puntuación
-
Vendido
-
Páginas
4
Grado
A+
Subido en
25-06-2024
Escrito en
2023/2024

. Assumptions CM 4.7.2 PMBOK 5.3.3.1 - ANSWERProject planning is ongoing as the team analyzes how long it will take to process both a new order and a change order through the new call center. This analysis helps them determine how many employees must be working in the car center based on anticipated customer volume. This is an example of what? A. Determine budget CM 7.13; PMBOK 7.3 - ANSWERThe project manager and her team are involved in establishing the cost of the project and applying them to the schedule in order to determine when these cost will occur. During the project during which process does this occur? D. initiating, planning, executing, monitoring and controlling, closing (IPEM&CC) CM 3.3.1; PMBOK 1.5.1 - ANSWERDuring project performance, the team will focus on the Project Life Cycle and the project management life cycle. What are the five phases of a project management life cycle (PMLC)? A. Risk Seeker CM 11.2.7; PMBOK 11 INTRO - ANSWERThe project manager is considering quitting his job to develop a book and supporting products for the project management professional exam, and idea he created outside his job. If it sells well, he plans to start his own company and sell the products full-time. What characteristics is he showing towards risk? D. all of the above (Interactive, Push, Pull) CM 10.3.5; PMBOK 10.1.2.4 - ANSWERWhich of the following communication methods should be applied to managing project engagement? B. Analogous estimating CM 6.4.2; PMBOK 7.2.2.2 - ANSWERThe planning is progressing on schedule for the hotel renovation project. The project manager and the team are ready to begin estimating cost. Since the customer needs an estimate as soon as possible, what estimating methods should the team use? C. Sunk Cost CM 7.5; PMBOK NO REF - ANSWERYou are a project manager assigned to a project that has spent $4,000,000. The original budget was $1,500,000. Senior Management is considering stopping this project. What term describes the $1,500,000 that has been spent so far? D. All of the above (A duration of zero, the competition of a major event in the project, the completion of major deliverables) CM 6.2/6.6.15 PMBOK 6.6.3.2 - ANSWERThe project manager is having a team meeting and explaining to the team the upcoming Milestones that are due. What are the characteristics of a milestone? B. $10,000.00 CM 7.6.1; Calculating Standard Depreciation use begining value of asset subtracted by ending value then divide by the # of years. - ANSWERA new tape backup server has just been purchased for backing up the company's

Mostrar más Leer menos
Institución
CAPM
Grado
CAPM








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CAPM
Grado
CAPM

Información del documento

Subido en
25 de junio de 2024
Número de páginas
4
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$13.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Papersbylee Chowan University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
22
Miembro desde
2 año
Número de seguidores
14
Documentos
1264
Última venta
2 meses hace

3.3

7 reseñas

5
1
4
1
3
4
2
1
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes