PTC - POSITIVE TRAIN CONTROL SYSTEM - PART II Qs&As
PTC - POSITIVE TRAIN CONTROL SYSTEM - PART II Qs&As 1 / 2 1. Trains operating with failed cab signals in PTC territory will be governed by rules.: Cab Signal Failure 2. TRUE OR FALSE: When the on-board PTC apparatus is cut out because of an en-route cab signal failure the PTC system will continue to enforce track speed limits, restrictions and signals displaying stop.: TRUE 3. TRUE OR FALSE: When the on-board PTC apparatus is cut out because of an en-route cab signal failure the system will continue to enforce Slow Speed, Medium Speed, Limited Speed, and Restricted Speed routes within Interlocking limits.: FALSE. Restricted Speed is a method of operation and not a speed 4. Positive Train Control (PTC) is a system that uses transponders and data radio to supplement what system?...
Escuela, estudio y materia
- Institución
- PTC
- Grado
- PTC
Información del documento
- Subido en
- 19 de junio de 2024
- Número de páginas
- 2
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
ptc
-
qsas
-
ptc positive train control system part ii
-
1 trains operating with failed cab signals in ptc
-
2 true or false when the on board ptc apparatus
-
3 true or false when the on board ptc apparatus
Documento también disponible en un lote