What is a project? - ANSWERA temporary endeavor undertaken to create a unique product, service, or result Every project has: - ANSWER- A start and finish point -A deliverable Project Planning: - ANSWERthe process of choosing the one method and order of work to be adopted for a project from all the various ways and sequences in which it could be done." Project planning elements include: - ANSWERscope, design and alternate designs, cost, time, finance, land, procurement, operations, etc. Shape and content of the project plan depends on? - ANSWER-purpose of the plan -timing of the plan -level of details needed Project scheduling - ANSWERdetermination of the timing and sequence of operations in the project and their assembly to give the overall completion time. Scheduling takes one part of the planning effort and zooms in on it. What questions does planning answer - ANSWERwhat, how, who, why, where, by whom, when, how much what question does scheduling deal with? - ANSWER"when" on a detailed level Ty
Escuela, estudio y materia
- Institución
- CMGT 4100-
- Grado
- CMGT 4100-
Información del documento
- Subido en
- 9 de junio de 2024
- Número de páginas
- 11
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
cmgt 4100 test 1 ch 12345 questions answ
-
cmgt 4100 test 1 ch 12345 stuvia
Documento también disponible en un lote