BICSI RTPM (Study for Telecommunication Project Manager) Exam Questions with Answers 2024. Terms like: design and implementation/installation - Answer: Telecommunications project management (TPM) typically consists of two distinct processes: Design PM Tasks - Answer: Review expression of interest for client Perform a user needs analysis Perform site surveys and meet with client Generate preliminary design submittals Respond to/incorporate client comments Prepare final bid documents/RFP and engineer's cost estimate Issue final RFP package to client Client makes RFP available to potential bidders

Mostrar más Leer menos
Institución
BICSI RTPM (Study For Telecommunication Project Ma
Grado
BICSI RTPM (Study for Telecommunication Project Ma











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
BICSI RTPM (Study for Telecommunication Project Ma
Grado
BICSI RTPM (Study for Telecommunication Project Ma

Información del documento

Subido en
7 de junio de 2024
Número de páginas
52
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

BICSI RTPM (Study for
Telecommunication Project Manager)
Exam Questions with Answers 2024.
design and implementation/installation - Answer: Telecommunications project
management (TPM) typically consists of two distinct processes:


Design PM Tasks - Answer: Review expression of interest for client
Perform a user needs analysis
Perform site surveys and meet with client
Generate preliminary design submittals

1|Page

,Respond to/incorporate client comments
Prepare final bid documents/RFP and engineer's cost estimate
Issue final RFP package to client
Client makes RFP available to potential bidders


Implementation of TPM Project Flowchart - Answer: Review client RFP
Perform Site Survey
Organize and Submit Bid Questions
Organize and Submit Final Proposal
Client Awards Contract NTP
Contractor Mobilizes
Project Implementation


Project - Answer: Temporary endevour that has a definite beginning and end,
whose end result is the delivery of a product or service. Projects are governed by
limits (constraints).


Project Constraints - Answer: Time, Cost, Quality, Resources, Risks, Safety,
Technology, Stakeholders, Environment


Project Stakeholders - Answer: Sponsor
Portfolio Manager
Client
Sellers
Business Partner

2|Page

,Operations Manager
Functional Manager
Project Manager
Program Manager


Project Team Members - Answer: Manufacturer
Engineer
Government / Regulatory
Supplier
Vendor
Admin/ Clerical
Supervisor
Other Trades
Consultant
Coworker
Customer


ICT Professional's Role is Affected By: - Answer: Current & future technology
Availability of resources
Complex equipment
Advanced tools
Constant refinement of standards
International, National, Regional and Local Codes
Intricate and evolvoing designs



3|Page

, Phases of a Project - Answer: Design
Bidding
Construction
Post-Construction


PM Tools - Answer: Program Evaluation Review Technique (PERT)
Gantt - Schedule of activity, bar chart
Critical Path Management
Earned Value Management


TPM Steps - Answer: Developing a Plan
Implementing the Plan
Managing/ Tracking the Plan
Closeout the Project


TPM Knowledge Areas - Answer: Integration
Scope
Time
Cost
Quality
Human Resources
Communications
Risks
Procurement
Stakeholders

4|Page
$22.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Reseñas de compradores verificados

Se muestran los comentarios
9 meses hace

5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Studyresource1 Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
7243
Miembro desde
1 año
Número de seguidores
24
Documentos
1361
Última venta
1 mes hace
EXCELLENT TUTOR.

Veteran teacher / Tutor with years of experience planning and implementing study documents, case studies, test banks and all kinds of exams questions with well articulated answers for students. Passionate and highly effective with success in study guide strategies to develop students\' academic skills and raise test scores.

4.6

708 reseñas

5
490
4
148
3
58
2
10
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes