CSU CON 101 EXAM 2 REVIEW QUESTIONS AND ANSWERS, GRADED A+/ VERIFIED.
CSU CON 101 EXAM 2 REVIEW QUESTIONS AND ANSWERS, GRADED A+/ VERIFIED. What are the Drawings and Project Manual? - -Contract Documents What are vertical "cuts" through a building? - -Section Views What are: Bidding Documents, Agreement, General Conditions, Supplementary Conditions, Technical Specifications - -Project Manual What is arranged using the CSI MasterFormat? - -Technical Specifications (Know Standard Divisions). What is the section that provides fundamental definitions for the contract, the work, and the drawings and specifications? - -General Provisions Who determines which type of contract will be used on a project? - -Owner What is a written request from the owner to change the scope of the project? - -Change Order What contract balances risk between the owner and the contractor? - -GMP Who bears the burden of a cost over-run in a Lump Sum Contract? - -Contractor How does an owner generally pay for construction? - -Through a series of monthly payments (or draws) What are final drawings used for the construction. - -Working Drawings or Contract Documents. What are the steps in the design process? - -(1) Programming and Feasibility, (2) Schematic, (3) Design Development, and (4) Contract Documents What is the step in the design phase when the financial feasibility of the project is first evaluated? - -Programming and Feasibility What is the process in which the architect sends the documents to the building department to determine if the plans follow code? - -Plan Check Who is responsible for ensuring that the design meets all building codes? - -Design Team What is one of the most underutilized resources available to the design team? - - Construction field personnel who actually install the building systems Or users of the project/building What is the process of identifying the best solution relative to cost? - -Value Engineering What is the process of identifying problems or areas of concern that exist with a project so that information can be factored into the decision-making process during the preconstruction phase? - -Due Diligence Which team member is tasked with assisting the PM and Super with managing the details of the contract? - -Contract Administrator Which team member moves back and forth between the jobsite and the office? - - Project Manager What agreement is used to purchase labor and possibly materials? - -Subcontract What are materials, labor, equipment and subcontract costs? - -Direct Costs What is the agreement between a vendor and a customer for the provision of certain products that meet a particular specification for a specified price? - -Purchase Order What is a contractor that self-preforms very little work? - -
Información del documento
- Subido en
- 7 de junio de 2024
- Número de páginas
- 8
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas