CSU CON 101 EXAM 1 REVIEW QUESTIONS AND ANSWERS, GRADED A+/
CSU CON 101 EXAM 1 REVIEW QUESTIONS AND ANSWERS, GRADED A+/ Agency CM - -Cons. Manager acts on the owners best interest but is not financially responsible Building Inspectors, utility companies, insurance companies, labor union - -2nd level secondary players Closed bid - -Used by private and not public projects. Invitation only via invitation for bids Design-bid-build - -Traditional project delivery method -owner holds two separate contracts for design and build Design-build - -Newer delivery method where there is only 1 contract between the owner and Design/Builder. Design/Builder is responsible for both ends. Estimator Track - -Quantity Surveyor Estimator Senior Estimator Chief Estimator Fast-tracking - -a practice utilized to speed up job by overlapping the design and construction phrase. GMP - -Guaranteed Maximum Price Government, financial institutions, trade associations, educational institutions - -3rd level secondary player How is the Code of Hammurabi important to construction? - -First known recorded building code. In what time period was the concept of a Theoretical Architect developed? - -The Renaissance In which industry sector are Engineers often the lead designers? - -Industrial Invitation for bids - -Notification sent to a selected list of contractors on the submission of bids on PRIVATE project IPD - -Integrated Project Delivery Low-bid selection method - -Obtain the plans and specs Review the plans and spec
Información del documento
- Subido en
- 7 de junio de 2024
- Número de páginas
- 7
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas