CEPT Bobtail Operations Questions and Answers (A+ Score) 2024
CEPT Bobtail Operations Questions and Answers (A+ Score) 2024 1) A container pressure leak check occurs when the testing instrument is - placed after the service valve and before any regulators 2) A driver is assigned a propane delivery vehicle that had its last full mechanical inspection 14 months ago. According to CFR, is it acceptable to drive this vehicle? - no, the vehicle must be removed from service until annual inspection is performed 3) a register - may be equipped with a ticket printer or an electronic meter to ensure in gallons the amount of liquid deliver and print ticket 4) As part of the driver qualification file, how often must cdl drivers complete a certificate of violations? - Annually 5) At what PSI will the pressure relief valve open to release vapor - 250 psi 6) DOT requires bobtails in delivery service to limit the delivery hose to a nominal inside diameter of - 1 1/4'' or less 7) Fixed Maximum Liquid Level Gauge - Indicates when the cargo tank is filled to its maximum permitted filling level 8) Float Gauge - Continuously indicates the liquid level of propane by float in the container that moves up and down
Escuela, estudio y materia
- Institución
- Alabama State University
- Grado
- CEPT Bobtail Operations
Información del documento
- Subido en
- 1 de junio de 2024
- Número de páginas
- 3
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
cept bobtail operations questions and answers a
-
cept bobtail operations questions and answers