Stationary Engineer Exam Questions and Answers Latest 2024/2025 (GRADED A+)
Stationary Engineer Exam Questions and Answers Latest 2024/2025 (GRADED A+) How much clearance from the top of the boiler is needed for a HP boiler that produces 70000 lbs of steam? - Answer 7 feet On a gas fired boiler what is the proper gas to air mixture - Answer 30%-70% and in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 remember% What is the total hardness in a system that was found to have calcium hardness of 60ppm and magnesium hardness of 18ppm and carbon hardness of 12 ppm? - Answer TH=(Ca x 2.5) + (Mg x 4.1)nTH=(60 x 2.5) + (18 x 4.1)nTH= 150+73.8 =( 223.8 PPM) How often should a complete external inspection of the boiler be done? - Answer Once a Shift With 24 hr operation how often do you check the water level? - Answer Once per shift How often do you check the LWCO? - Answer Once per shift How often do you check the High Limit Switch? - Answer Annually A 2" pipe was found to be delivering water at 100 psia at 1040ft per second. How many gallons per hour will it deliver? - Answer GPM= V (diameter squared) divided by .4085 ANSWER pg 469 BOG What controls the amount of blowback on a safety valve? - Answer Blowback ring or adjusting ring On a open air expansion tank hot water boiler system; how high should it be mounted? - Answer (4 Feet ) above the highest heating element. What is the minimum top clearance of boilers with manholes? - Answer 5 feet Package boilers; steam heating boilers and hot water heating boilers shall have a minimum clearance of? - Answer 2 feet from ceiling. Code chapter 10 page76 Most important safety device on a boiler? - Answer Safety relief valve What does a Black Liquor Boiler do? - Answer Black Liquor is the by product of wood pulp processing in the paper making industry. What does Black liquor boiler known for? - Answer Steam generation and Stationary Engineer Exam Questions and Answers Latest (GRADED A+) recovery of soda ash Maximum line voltage for control on a boiler? - Answer 150 volts Under what code are boilers designed and constructed? - Answer ASME- CSD 1 How many low water cut offs are needed per code for a hot water system when a boiler has inputs greater than 400,000 btu per hr - Answer 1 LWCO is needed. What is the minimum and maximum size for a safety valve per code for boilers? - Answer Minimum 3/4" and Maximum 4 1/2" What stamp is put on a boiler after repairs? - Answer "R" What is the equalizing system used for? - Answer The equalizing system is for warming up the steam lead. A blowdown valve is located at the lowest water space of a boiler for three purposes - Answer 1. to remove precipitated sludge or loose scale n2. To permit rapid lowering of the boiler water if it has become too high accidentally n3. As a means of removing water from the boiler so that fresh water may be added to keep the concentration of solids below the point where difficulties may be experienced. In the old power boiler which type of feed-water regulators were not used? - Answer Electronic After opening a boiler for repairs how much oxygen is needed? - Answer 19% What is the first thing you do when shutting down a boiler? - Answer Turn off (extinguish fire) What is the legal limit of acceptable asbestos particles ? - Answer 0.1 fibers per cubic centimeter What is CREEP? - Answer Creep is defined as the slow deformation of material with time; with the deformation taking place at elevated temperatures with no increase in stress. What is the BTU content of Anthracite coal? - Answer 14000 btu/lb What substance transfers electrical current in a photocell? - Answer Electricity will flow when the CADMIUM is exposed to sufficient light. What device acts as a check valve in both directions and keeps pumps primed? - Answer FOOT VALVES are used for pumps under suction pressure to prevent backflow primed? on the suction line. What protects boilers from explosion in the furnace? - Answer A flame guard system is an arrangement of flame detection system; interlocks; and relays which will sense the presence of a proper flame in a furnace and cause fuel to be shut off to the furnace if a hazardous condition develops (improper flame or combustion). What size pipe is used as a header in a boiler operating at 100psi? - Answer 6 inches What device is used to measure flue gasses - Answer The Orsat Analyzer Which low water cut off does not have a mercury switch? - Answer The Submerged electrode type What is the btu output per lb of #4 fuel oil? - Answer 18 What substance is used for the electric transmission in an RTD? - Answer Platinum is used because of its stability at high temperatures How much air is needed for the combustion of pulverized coal; gas; oil? - Answer 50% for coal and 10-30% for gas & oil In old power boilers which type of feedwater regulators were not used? n(A) hydraulic n(B) float n(C) thermostatic expansion n(D) electronic - Answer ANSWER D electronic/electro-magnetic What is hard forming scale? - Answer Silica With hydroxide present and normal oxygen levels which chemical will cause problems? - Answer Chlorine The result from steel manufacturing and under pressure in boilers tends to cause buldging? A buldge is caused by ? - Answer A buldge is caused by overheating of the shell plates and it affects the entire thickness of the plate. A blister is caused by what ? - Answer Slag inclusion forming a lamination at the time the plate was rolled at the steel mill. A blister is a separation of the metal from the shell plate caused by impurities rolled into the shell plate when formed. With normal oxygen and low alkalinity. what is added to the boiler water? - Answer Neutralizing Amines Which chemical is used to combat scale? - Answer Combined phosphate treatment- sodium phosphate Other than sulfite what chemical is used to combat corrosion in boilers? - Answer Hydrazine What will neutralize acid? - Answer Alkali and Lime Soda What mechanical device is used to remove scale from firetubes? - Answer A tube rattler or vibrator What percentage of the pressure should a boiler have before you test the lever of a safety valve? - Answer 75% Where is internal corrosion most likely to occur on a vertical tube boiler? - Answer Water leg-Mud leg What are the minimum and maximum sizes permitted for blow down valves or connections? - Answer 3/4"minimum 2 ½ " maximum A boiler operating at a pressure of 65lbs. What is the smallest size feed and blow off connections if the safety valve is set at 90 psi? - Answer ½ " feed ¾ " blow off How often should water columns and water glass levels be checked on a high pressure boiler? - Answer (Once A Shift)nAt the beginning of each shift - beginning of the work effort What takes no actual action chemical part in combustion? - Answer Nitrogen How many ppm of EDTA are needed to tie up 1ppm of hardness? - Answer EDTA requires 10ppm of EDTA and 5 NTA to tie up each 1ppm hardness. On a package boiler; how many ways could cause fire puffs when it is started up? - Answer 6 ways 1-poor starting draft 2-incorrect firebox 3-wrong burner nozzle 4-lean fire 5- insufficient gas pilot or excessive gas pilot 6-water in the oil What is the grade of light domestic fuel oil ? - Answer Grade 1 ( Number 1 ) How often should you test the operating control? - Answer Annually How often should the testing and inspecting of the burner component? - Answer Annually A lead sulfite photocell is what type of flame sensor? - Answer Infrared light sensing What is the least amount of oxygen needed when a nitrogen blanket is used? - Answer 19% How should a boiler be prepared for inspection? - Answer Extinguish fire and allow boiler to cool slowly. Open the blow down and the drain; vent the boiler to the atmosphere Soot and ashes should be removed from all tubes; shell plates; heads; seams and every accessible external surface. The blow down should be shut if any other boiler feeds this line. Manhole - handhole plates and inspection plugs should be removed. All loose deposits of sludge or sediment should be washed out. The blow down should only be opened when it is certain that there is no pressure in the line and no one is inside the boiler. Any scale or oil deposits should be left for the water treatment specialist to see for analysis. A boiler properly prepared for inspection should be cool; dry and clean. It is advisable to attach a red tag marked "person in boiler" to the steam; blowdown; feed and fuel valves and also to the manhole plate whenever someone is inside a boiler. What function can a boiler operator contribute to boiler maintenance? - Answer A) maintain a safe reliable plant B) maintenance and efficient plant C) Inspection and logging of items that need to be corrected during the next maintenance period What are manholes and handholes on a boiler for? - Answer Examination or cleaning How do you protect a steam boiler? - Answer Safety valve How to you protect a pressure vessel? - Answer Pressure relief valve How do you protect a hot water boiler? - Answer Pressure relief valve What gages are on a steam boiler? - Answer Water gage glass and pressure gage Methods used to control the temperature of a superheater? - Answer Bypass damper - spray-type desuperheater - attemperator - condenser - tilting burner - flue gas recirculation What chemical would you use to prevent hard scale from forming in the boiler tubes? - Answer Disodium phosphate and trisodium phosphate What chemical compounds in water cause permanent hardness? - Answer Calcium sulfate and magnesium sulfate What factors must be taken into consideration when choosing a control for a boiler? - Answer 6 factors 1. Steam pressure 2. Furnace pressure and draft 3. air pressure and flow 4. feed water pressure and flow 5. Flue gas flow & composition 6. proper ignition & burner - flame control How many safety controls shut down a boiler when an unsafe condition occurs? - Answer 7 controls 1. Pressure limit or temperature 2. Low water fuel cutoffs 3. Flame failure safeguard systems 4. Automatic ignition controls 5. oil and gas fuel shutoffs/valve controls 6. air and fuel pressure interlock controls 7. feed water regulating controls
Escuela, estudio y materia
- Institución
- Stationary engineer
- Grado
- Stationary engineer
Información del documento
- Subido en
- 30 de mayo de 2024
- Número de páginas
- 63
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
stationary engineer
-
latest updated 2024
-
graded
-
vverified answers
-
stationary engineer exam questions and answers
Documento también disponible en un lote