CQM-C Questions and answers latest update The purpose of Construction Quality Management is to: Achieve the quality established by properly developed requirements through the combined responsibility, but seperate efforts of contractpr smd government personnel. Construction Quality Management is the performance of tasks, which ensure that construction is performed. According to plans and specifications, on time, within a defined budget and a safe work environment. Partnering relationships are based upon: Building trust and dedication to common goals It is the responsibility of Quality Assurance Personnel to: Periodically verify that the contractors system of control is working effectively. An effective contractor quality control program will: Be an incentive for work to be done correctly the first time resulting in earlier completion, reduced field overhead costs, and greater profits. The success or failure of all contractors is based upon: The ability to control costs, finance work, estimate jobs, schedule the work, and maintain effective quality control. Quality Assurance Personnel have the responsibility to: Require contractors to maintain the quality specified in the plans and specifications. Inspection is: The process by which ongoing and completed work is examined During the punch-out inspection of a project: Quality Assurance Personnel must assure that the contractor prepares a punch-list and makes corrections. If there is a disagreement whether the contractors work complies with the contract: The government makes the final determination Characteristics that describe a definable feature of work include: Cross-referenced listings to the contractors construction schedule that may have more than one definable feature under a section of the specifications. The _____________________ consists of daily checks of the work to assure continuing compliance with contract requirements. Follow-up phase

Mostrar más Leer menos
Institución
Grado








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Grado

Información del documento

Subido en
21 de mayo de 2024
Número de páginas
4
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CQM-C Questions and answers latest update
The purpose of Construction Quality Management is to:
Achieve the quality established by properly developed requirements through the combined
responsibility, but seperate efforts of contractpr smd government personnel.


Construction Quality Management is the performance of tasks, which ensure that construction is
performed.
According to plans and specifications, on time, within a defined budget and a safe work environment.


Partnering relationships are based upon:
Building trust and dedication to common goals


It is the responsibility of Quality Assurance Personnel to:
Periodically verify that the contractors system of control is working effectively.


An effective contractor quality control program will:
Be an incentive for work to be done correctly the first time resulting in earlier completion, reduced
field overhead costs, and greater profits.


The success or failure of all contractors is based upon:
The ability to control costs, finance work, estimate jobs, schedule the work, and maintain effective
quality control.


Quality Assurance Personnel have the responsibility to:
Require contractors to maintain the quality specified in the plans and specifications.


Inspection is:
The process by which ongoing and completed work is examined


During the punch-out inspection of a project:
Quality Assurance Personnel must assure that the contractor prepares a punch-list and makes
corrections.


If there is a disagreement whether the contractors work complies with the contract:
The government makes the final determination


Characteristics that describe a definable feature of work include:
Cross-referenced listings to the contractors construction schedule that may have more than one
definable feature under a section of the specifications.


The _____________________ consists of daily checks of the work to assure continuing compliance
with contract requirements.
Follow-up phase
$10.69
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
LectAziim Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
21
Miembro desde
2 año
Número de seguidores
13
Documentos
4151
Última venta
3 meses hace
Dont stress yourself on study materials .LectAziim got it all

"Unlock your potential with our online writing store! Discover expert guidance, personalized feedback, and tools for every writer's journey. From crafting compelling essays to mastering creative storytelling, our platform offers interactive courses, one-on-one coaching, and resources tailored to your goals. Start writing your success story today with us!"

5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes