ACI FIELD GRADE 1 Correctly Answered Questions| UpToDate | Already Graded A+
Collecting a representative sample of concrete to be tested is as important as executing the test methods to obtain. ☑: Accurate Results This practice covers sampling from five types of equipment, which are ___________, ___________, __________, __________, and __________. ☑: stationary mixers, paving mixers, revolving truck mixers,continuous mixers. The elapsed time between obtaining the first and final portions of a composite sample shall not exceed. ☑: 15 minutes Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True of False? ☑: True Start the tests for slump, temperature, and air content within how many minutes after obtaining the final portion of the composite sample? ☑: 5 Minutes EXCELLENCE 2 Start molding specimens for strength tests within how many minutes after fabricating the composite sample? ☑: 15 Minutes The concrete sample must be protected from contamination and _____. ☑: Rapid Evaporation The minimum size sample for making strength test specimens is. ☑: one cubic foot When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch ☑: 2
Escuela, estudio y materia
- Institución
- ACI
- Grado
- ACI
Información del documento
- Subido en
- 13 de mayo de 2024
- Número de páginas
- 22
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
aci field grade 1 correctly answered questions u
Documento también disponible en un lote