Design-Build - correct answer a method of project delivery in which one entity (design-builder) forges a single contract with the owner to provide for architectural engineering design services and construction services. Essential Concepts of Design-Build - correct answer Contractor & A/E have a direct contractual relationship Single point of responsibility contract controls Design Process Design-Cost relationship Plans & Spec Warranty D-B teaming concepts Design-Build Entity Configurations - correct answer Contractor Led A/E Led Integrated Firm Developer Led Joint Venture 3 Initial Design Build Contract Documents - correct answer RFP Technical Proposal Price Proposal RFP - correct answer Request for Proposal Technical Proposal - correct answer Non-price items Package the Design-Build Team prepares for proposal: ex.- drawings, written specs, renderings, models, and safety plans Price Proposal - correct answer Stipulated Sum proposed based on Technical Proposal Operational Arrangement Variations - correct answer Direct Design-Build Design Criteria/Design-Build Preliminary Design/Design-Build Other Hybrids (Design Draw-Build) Direct Design Build - correct answer Program is developed by the Design-Builder Allows Design-Build project delivery to operate in its purest and most unfettered form. Design Criteria / Design-Build - correct answer Owner defines problem (programs), but Design-Builder provides design solutions. Owner provides just enough performance data for firms to develop costs Method provides the potential for multiple creative design solutions. Preliminary Design / Design-Build - correct answer Owner programs and Owner's A/E develop initial design concept; Design-Build A/E finishes design (construction documents) and builds projects. Design Risk can shift from the D-B to the Owner. Owner providing some level of design is referred to as "Bridging" Used for repetitive projects - fast food, retail, some civil Design Draw-Build - correct answer 35% Design or Greater Typically Low Bid-Based Procurement (price only w/no technical) Design-Builder is selected on the basis of price only to complete the drawings and construct the project. 35% and on Design Phases - correct answer Programming Schematic Design Design Development Construction Documents Programming - correct answer a written statement of requirements of the building used as the basis for design and the Owner's budget & schedule -10%-35% Schematic Design - correct answer An investigation of different design alternatives that meets the programming statement -10%-35% Design Development - correct answer Continuation of the Schematic Design stage with design schemes further developed on a system-by-system basis with more detail. Construction Documents - correct answer Architect creates final working construction documents necessary to bid the job for construction pull permits and build the job in the field. Owner "Approval" of Design - correct answer Owner participates/concurs without taking on liability The Design-Builder controls the details of the design Owner approves for "Compliance Only" relative to RFP. Owner "reviews and approves" the final construction drawings. Approval not to be construed as transferring liability. Plans/Specs Warranty - correct answer Design-Build: Design-Builder warrants the sufficiency of the plans and Specs to the owner Design-Bid-Build: Owner warrants the sufficiency of the plans and specs to the contractor. 3 Parts of Project success in Design-Build - correct answer Performance and Quality Budget Requirements Schedule Requirements By its very nature, Design-Build.... - correct answer allows for delivering beyond expectations provides an opportunity to optimize all aspects of the solution can deliver solutions that other

Mostrar más Leer menos
Institución
DBIA.
Grado
DBIA.









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
DBIA.
Grado
DBIA.

Información del documento

Subido en
11 de mayo de 2024
Número de páginas
11
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$13.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
RealGrades Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
192
Miembro desde
2 año
Número de seguidores
53
Documentos
12317
Última venta
2 semanas hace

4.0

26 reseñas

5
12
4
5
3
7
2
1
1
1

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes