Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

CSTM 451 Exam #2 Review Exam With All Complete Answers 100% Verified/2024.

Puntuación
-
Vendido
-
Páginas
4
Grado
A+
Subido en
11-05-2024
Escrito en
2023/2024

T/F According to DBIA, lack of communication is the number one reason why teams fail. - correct answer False The _____ is responsible for choosing a selection panel who help decide which proposer wins the award of the project. - correct answer Owner Under Design-Build, the _______ owns the details of the design. - correct answer Design-Build Entity T/F When us using a Best Value Criteria Matrix, the proposer/design-build entity with the lowest price wins the award. - correct answer False T/F An essential concept of Design-Build is that there are multiple points of responsibility. - correct answer False In determining the selection panel, the ideal size for most projects is _______ people. - correct answer 4-6 What is the distinguishable characteristic between collaboration and integration? - correct answer Integration is blending together into a whole at a common area. Collaboration is working together by inputting individual information. T/F After receiving proposals from shortlisted teams, if the owner has difficulty choosing a design-build team, the owner may request the teams present their best and final proposal. - correct answer True T/F QBS is a two-step process - correct answer False T/F An RFQ should either qualify or disqualify a design-build entity from a job. - correct answer False According to DBIA the communication model includes four parts; Message, Receiver, _________, and Sender - correct answer Feedback T/F An invitation to bid typically includes prescriptive plans ans specs. - correct answer True T/F The organizational structure of the D-B team should be established as soon as the pursuit of a project begins. - correct answer False T/F The owner has the power to influence teaming effectiveness by inserting clauses into the RFP that support integration of team members. - correct answer True True - correct answer T/F The RFP has three functions in a Design-Build setting. They communicate the data and knowledge relevant to the project, establish the owner's role, and clearly state the design-builders role. T/F Design Risk can shift from the owner to the Design-Builder only proportionate to the amount of design furnished by the owner. - correct answer False Uniformat Group A - correct answer Substructure Uniformat Group B - correct answer Shell Uniformat Group C - correct answer Interiors Uniformat Group D - correct answer Services Uniformat Group E - correct answer Equipment & Furnishings Uniformat Group F - correct answer Special Construction & Demolition T/F In order to get the most out of a conceptual cost estimate you must "operationalize" the numbers. - correct answer True T/F According to DBIA, one likely use of bridging documents is for repetitive projects such as fast-food stores. - correct answer True T/F Design Draw-Build is typically low bid based. - correct answer True T/F Case precedence supports Design-Build entities receiving 35% or more of a design in an RFP legally cannot be held liable for the design. - correct answer True T/F Design Build RFPs with 30% plus of the design provided leads to price oriented selections. - correct answer True T/F Under Design Criteria and Preliminary Design DB operational arrangements, the Design-Build functional and performance requirements are the owners responsibility. - correct answer True T/F When a Design-Build proposal comes in it is best to send it off first to the technical evaluation committee. - correct answer True T/F Under DB estimating sequence, the estimate does not grow, it is refined. - correct answer True Co-Location - correct answer Designers and contractors are placed in close proximity to one another. Interdisciplinary Fluency - correct answer Regardless of a team member's discipline, the team can think through a problem by looking at it from multiple perspectives. Design-Build RFP - correct answer Describes the procurement process, forms the basis for final proposals, and becomes and element of the contract. 3 contract documents that initially govern the DB agreement - correct answer RFP, technical proposal, price proposal Design proposals with 35% or less of the design in the RFP will likely be procured through: - correct answer Best Value or QBS Design-Build design and cost relationship - correct answer Design the project to the cost; cost and performance are fixed. Two-Envelope Proposal - correct answer Any selection process in which qualitative proposals are submitted separately from price proposals. Functional Requirement - correct answer Expresses the Owner's needs and the expected operation of the end product. When is the design considered to be committed? - correct answer -The drawings and specs are approved by the DOR as complying with the RFP and has been confirmed that it is within budget.

Mostrar más Leer menos
Institución
DBIA.
Grado
DBIA.








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
DBIA.
Grado
DBIA.

Información del documento

Subido en
11 de mayo de 2024
Número de páginas
4
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$13.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
RealGrades Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
192
Miembro desde
2 año
Número de seguidores
53
Documentos
12317
Última venta
2 semanas hace

4.0

26 reseñas

5
12
4
5
3
7
2
1
1
1

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes