EXTENDED PROJECT QUALIFICATION
LEVEL 3 (7993)
PROJECT PLAN
, Contents
Chapter Page(s)
Contents 1
Preparing for my project plan 2-4
1. Main tasks 4-5
1.1 Planning and Research 4
1.1.1 Breadth Planning 4
1.1.2 Depth Planning 4-5
1.1.2.1 Interviews and Primary Research 5
1.2 Writing and drafting 5
2. The Critical Path
2.1 My critical path 5-7
2.2 Why analyse the critical path? 2
3. Time management 3
3.1 The table method – a broader overview 7-8
3.1.1 Evaluating this method 8-9
3.2 Gannt Chart 9
3.2.1 Creating a Gannt Chart 9-11
3.2.2 Evaluating the Gannt Chart Method 11-12
3.3 Time management – conclusion 12
4. People
4.1 Centre Coordinator 12
4.2 Supervisor 13
4.2.1 Supervisor Communication 13
4.3.1 List of Specialist Contacts 13
4.4 Research Specialists 14
5. Format 14
6. Progress Monitoring 14
7. Summary of Planning Review 14
1 of 14