CMCA PRACTICE EXAM QUESTIONS WITH CORRECT ANSWERS|100% verified
CMCA PRACTICE EXAM QUESTIONS WITH CORRECT ANSWERS Preparing a bid request includes which of the following: A. Verifying References. B. Identifying potential contractors. C. Recommending a contractor to the board. D. Verifying contractor insurance. CORRECT ANSWER B Legal review prior to executing a contract will assist the association in the event that: A. A subcontractor is used. B. A performance bond is required. C. There is a budgetary shortfall. D. The board has questions or concerns. CORRECT ANSWER D Rather than describing the scope of work in detail in the contract, a manager may: A. Attach the bid specifications. B. Call each contractor to describe the job. C. Be on-site to oversee project content. D. Suggest the board meet the contractor to talk about the scope of work. CORRECT ANSWER A In older condominiums, an association should have what type of contract covering mechanical equipment? A. Time and materials B. Specific repair C.Service D. Preventative maintenance CORRECT ANSWER D For which project would a board most likely want to use a consultant to help develop bid specifications? A.Landscape renovation project B. Repairing and/or replacing roofs C. Painting the interior of lobbies and hallways D. Repairing HVAC and boilers CORRECT ANSWER B
Información del documento
- Subido en
- 9 de mayo de 2024
- Número de páginas
- 5
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas