u1 ust installer/retrofitters TEST Questions and 100% Correct Solutions
when a bottom hold down pad is used under a steel tank. - Ans the bedding material may be reduced to 6" cover in areas that are subject to vehicle traffic - Ans 30" compacted backfill and 6" of asphaltic concrete, or 18" of compacted backfill and 6 to 8" of reinforced concrete. paving over tanks in traffic areas should extend 1 foot beyond tank perimeter. - Ans cover in non traffic areas should be atleast 2' thick and consist of a minimum of 1' of backfill covered by filter fabric and a minimum of 1' earth. - Ans an acceptable alternative is 1' backfill material and atleast 4" of reinforced concrete or 6" of asphalt paving
Escuela, estudio y materia
- Institución
- U1 UST Installation/Retrofitting
- Grado
- U1 UST Installation/Retrofitting
Información del documento
- Subido en
- 8 de mayo de 2024
- Número de páginas
- 5
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
u1 ust
-
installerretrofitters
-
u1 ust installerretrofitters test questions
-
u1 ust installerretrofitters test
-
u1 ust installerretrofitters
Documento también disponible en un lote