U1 UST Installation/Retrofitting Exam| Questions and 100% Correct Solutions
8" reinforced concrete - Ans a bottom hold-down pad is typically constructed of 40 - Ans aboveground piping should be Schedule _____ galvanized or painted/coated black steel pipe 1. be fully compatible with the products stores and the underground environment 2. have sufficient strength to withstand the stress produced during construction. - Ans all piping components, including, fittings, gasket, o-rings, pipedope, and piping itself must: