AIPM Exam 1 Exam Questions and Answers 100% Pass
AIPM Exam 1 Exam Questions and Answers 100% Pass Who Determines mandatory training, education and experience requirements - Answer- Functional Advisors (FA) Who establishes and monitors training requirements and DAWIA compliance - Answer- Directors of Acquisition Career Management (DACM) What are the three risk factors - Answer- Cost, Schedule and performance What is required to begin an acquisition program - Answer- an approved need What are the Phases of PPBE - Answer- Planning, Programming, Budgeting and Execution Which area of systems engineering is involved through the entire life cycle - Answer- Systems Engineering Whos primary responsibility is to translate operational need into system performance specification - Answer- Government role When can state of the are technology be introduced - Answer- at any phase of the life cycle model Critical Acquisitin Positions (CAP) are designated at what level - Answer- LTC and above What are the three primary organizations influence the defense acquisition community - Answer- Executive Branch, Legislative Branch and Industry Who is responsible for the budgeting phase of PPBE - Answer- Comptroller Who is responsible for the Planning phase of PPBE - Answer- Under Secretary of Defense What ACAT level is reviewed by DAB? Who is the Chair - Answer- ACAT 1D-MDAP; Under Secretary for AT&L/DAE What ACAT level is reviewed by IPR? Who is the Chair - Answer- ACAT III, IPR Chair/PEO What ACAT level is reviewed by ASARC? Who is the Chair - Answer- ACAT 1C & II; ATL/AAE What resource specifies the criteria for ACAT level determination - Answer- DoDI 5000.02 What three things enable ACAT level s 4. indentification? - Answer- 1. Type of system 2. Level of Management review/decision authority 3. Applicable program reporting requirement 4. All of the above When does JCIDS occur - Answer- Before the Acquisition management process What are the three steps of JCIDS methodolgy - Answer- 1.Capbilities Based Assesment 2. Documentation of Capability Needs 3. Review,Validation, and Approval Where is the CPD prepared? - Answer- Prepared in the Engineering and Manufacturing Development (EMD) Phase What milestone is the CPD prepared for - Answer- Milestone C Which phase uses Low Rate Initial Production (LRIP) - Answer- Production and Deployment Who is the DAB Chair? - Answer- USD AT&L What is the final activity of the Life Cycle Model - Answer- Disposal What are the two reasons to initiate a new acquisition program - Answer- take advantage of new technology & react to an actual or potential threat. What are the 3 objectives of an Integrated Product and Process Development (IPPD) - Answer- Meet cost, schedule and performance objectives Product Design, manufacturing, business processes and sustainment process are optimized by utilization of what? - Answer- Mulitfuinctional teams What is an IPPD and give an example - Answer- Int
Escuela, estudio y materia
- Institución
- AIPMM
- Grado
- AIPMM
Información del documento
- Subido en
- 8 de mayo de 2024
- Número de páginas
- 10
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
aipm exam 1 exam questions and answers 100 pass
Documento también disponible en un lote