AFSB 152 Practice Exam Part A Questions and Answers 100% Solved
AFSB 152 Practice Exam Part A Questions and Answers 100% Solved The two main types of construction are heavy and highway construction and ️️The general building trades Dramatic increase in project size, taking work in new geographical areas, moving into new types of construction, and lack of management maturity are all factors that can result in ️️Contractor failure The Miller Act requires a contractor on a federal construction project to post two bonds, a performance bond and a ️️Labor and material payment bond Contractors would typically be granted relief from bidding mistakes from errors in ️️Mathematical calculation
Escuela, estudio y materia
- Institución
- Afsb
- Grado
- Afsb
Información del documento
- Subido en
- 7 de mayo de 2024
- Número de páginas
- 9
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
afsb 152 practice exam part a
-
questions and answers 100 solved
Vista previa del contenido
Documento también disponible en un lote