WALMART - STORMWATER EXAM
The 1970's law that set into place the regulation of stormwater is: - Answer- The Clean Water Act Requirements for managing stormwater activity on a construction site are outlined in the following regulation: - Answer- NPDES Which of the following is never an allowable stormwater discharge from a construction site? - Answer- Discharge from contaminated groundwater The Notice of termination can filed when: - Answer- All construction activity, inside and outside the building, is complete and permanent stabilization verified Relative to stormwater permitting, all of the following must occur before construction starts except: - Answer- Submit the notice of termination (NOT) Which erosion control best mgmt practice increases water infiltration, dissipates rainfall energy and slows overland flow of stormwater - Answer- Vegetation Of the following factors that influence erosion rates, the one a contractor has the most control over is: - Answer- Groundcover Temporary stabilization should be implemented - Answer- Immediately on all disturbed areas that are likely to or will remain inactive for 14-days or more The Primary purpose of a construction exit is - Answer- To remove sediment from construction site vehicles and minimize trackout
Escuela, estudio y materia
- Institución
- Walmart - Stormwater
- Grado
- Walmart - Stormwater
Información del documento
- Subido en
- 30 de abril de 2024
- Número de páginas
- 2
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
walmart stormwater exam