UTA INSY 2303 EXAM 3 REVIEW With Verified Solutions| Graded A+
Critical Path The sequence of stages determining the minimum time needed for an operation especially when analyzed on a computer for a large organization Colocation Center Centers that dedicate information systems which several corporations lease space and equipment Data Center a specialized facility designed to hold and protect computer systems and data Application Development Tool Software that assists in the creation of new software ERP Enterprise Resource Planning; it is a suite of software modules that integrate major business activities SDLC/Phases of the SDLC An information system progresses through several phases as it is developed, used, and retired order of phases Analysis > Design > Implementation > Maintenance > Planning main purpose System Requirements Report > Application Specifications > Working System > Project Development PlanFeature Creep A tendency for product or project requirements to increase during development beyond those originally foreseen
Escuela, estudio y materia
- Institución
- UTA INSY 2303
- Grado
- UTA INSY 2303
Información del documento
- Subido en
- 21 de abril de 2024
- Número de páginas
- 11
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
uta insy 2303 exam 3 review with verified solution