CMCA PRACTICE EXAM QUESTIONS & ANSWERS 100% SOLVED
Legal review prior to executing a contract will assist the association in the event that: A. A subcontractor is used. B. A performance bond is required. C. There is a budgetary shortfall. D. The board has questions or concerns. - ANSWER-D Rather than describing the scope of work in detail in the contract, a manager may: A. Attach the bid specifications. B. Call each contractor to describe the job. C. Be on-site to oversee project content. D. Suggest the board meet the contractor to talk about the scope of work. - ANSWER-A In older condominiums, an association should have what type of contract covering mechanical equipment? A. Time and materials B. Specific repair C.Service D. Preventative maintenance - ANSWER-D For which project would a board most likely want to use a consultant to help develop bid specifications? A.Landscape renovation project B. Repairing and/or replacing roofs C. Painting the interior of lobbies and hallways D. Repairing HVAC and boilers - ANSWER-B In what type of contract would a waiver of lien be recommended? A. Repair of the HVAC system B.Re-roofing the buildings C. Repair of the pool pump D. Annual tree pruning - ANSWER-B In terms of compensation , a contract should state: A. Who provides insurance coverage B. Each employees rate to perform work
Escuela, estudio y materia
- Institución
- CMCA
- Grado
- CMCA
Información del documento
- Subido en
- 12 de abril de 2024
- Número de páginas
- 4
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
cmca practice exam questions answers 100 solved
-
cmca practice exam questions answers stuvia
-
preparing a bid request includes which of the foll
Documento también disponible en un lote