Concrete Batch Plant Operator Exam (FDOT) Questions with Complete Solutions Graded A+
Concrete Batch Plant Operator Exam (FDOT) Questions with Complete Solutions Graded A+ Stockpiles of aggregate shall be maintained in a well-drained condition in order to: Minimize Free Water Content Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch for FDOT? 24 Free moisture of the aggregate means: Moister on the surface of an aggregate that is above and beyond the absorbed moister in the aggregate. If the moister test is done other than by the cook-out method, how often shall the other methods be verified? Each week For drill shaft concrete, the quantity of cement replaced with fly ash shall be: 33 thru 37% In concrete, which material has a specific gravity of one? Water Stockpiles of aggregate shall be maintained in a well-drained condition in order to: Minimize Free Water Content Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch for FDOT? 24 Free moisture of the aggregate means: Moister on the surface of an aggregate that is above and beyond the absorbed moister in the aggregate. If the moister test is done other than by the cook-out method, how often shall the other methods be verified? Each week For drill shaft concrete, the quantity of cement replaced with fly ash shall be: 33 thru 37% In concrete, which material has a specific gravity of one? Water
Escuela, estudio y materia
- Institución
- Concrete Batch Plant Operator
- Grado
- Concrete Batch Plant Operator
Información del documento
- Subido en
- 11 de abril de 2024
- Número de páginas
- 6
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
concrete batch plant operator exam fdot
-
questions with complete solutions graded a
Documento también disponible en un lote