Texas Wastewater A TOP Exam Questions And CORRECT Answers
Seeding of BOD samples is necessary when samples (All of the above) have a chlorine residual, have a previously been chlorinated, have been subjected to high temperatures, contain high or low pH industrial wastes When is blue-green algae the most dominant on a pond treatment system? Summer A 30-inch diameter wastewater interceptor is observed to be flowing half-full at about two fps. The approximate volume of wastewater flowing through the pipe is 3.14x1.25 x 1.25 x 2 = 4.9 cfs x 449 = 2,200 gpm c. 2,200 gallons per minute A one-cylinder reciprocating sludge pump with a 10-inch bore and a 5-inch stroke pumps at a rate of 50 cycles per minute. How many minutes must the pump be operated to pump 5,000 gallons of sludge? 3.14x0.416 x 0.416 x0.416 x 50 x7.48 = 84.5 gpm 5000 gal = 59,2min 84.5 gpm b. 29 60 minutes
Escuela, estudio y materia
- Institución
- Texas Wastewater A
- Grado
- Texas Wastewater A
Información del documento
- Subido en
- 10 de abril de 2024
- Número de páginas
- 19
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
texas wastewater a
-
texas wastewater
Documento también disponible en un lote