ABYC Systems Exam With 100% Correct Answers | Already Passed| Graded A+
E - Ball valves may be sealed to through hull fittings with: A. 5200 B. SikaFlex C. Teflon D. All the above E. None of the above B - Tubes are measured by: A. ID B. OD C. nominal size C - pipes may not be connected by: A. Welding B. Threaded fittings C. Compression fittings D. Glue C - Tech A says Seacocks must be readily accessible. Tech B say its ok to have them within 12" of the engine. who is correct? A. Tech A B. Tech B C. Both D. neither D - Tech A says that it is all right to connect an auxiliary line to the potable water pump as long as there is a siphon break. Technician B says you must have a lockable Y valve to prevent cross contamination. who is right? A. Tech A B. Tech B C. Both D. Neither D - A bildge pump discharge line must be: A. equipped with a check valve to prevent back flow and nuisance cycling B. Equipped with a properly installed seacock C. No more than 30' long D. non of the above
Escuela, estudio y materia
- Institución
- ABYC Systems
- Grado
- ABYC Systems
Información del documento
- Subido en
- 9 de abril de 2024
- Número de páginas
- 39
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
abyc systems exam with 100 correct answers
Documento también disponible en un lote