ARE 5.0 Construction & Evaluation Exam With 100% Correct Answers | Already Passed|Graded A+
Competitive bid - Can be public or private and involves more than 1 contractor Negotiated Bid - For privately funded projects, Owner and Architect work with 1 GC to reach a price Why would an Owner hire a Construction Manager as Adviser (CMa)? - To assist in project delivery by providing cost estimating, scheduling, and construction contract management services to the Owner Which project delivery limits the role and responsibilities of the Architect during preconstruction? - IPD Who is responsible for cost control in design-build delivery? - The GC (Architect is responsible for controlling cost of design services) Who must approve a proposed substitution? If approved, what is done with the proposal? - Architect. If approved, it becomes an addendum to be included in the bid documents Who is the only party who guarantees by contract all construction costs? - GC At a public hearing, which two items are announced by the Architect after each bid is opened? - - Bid amount - Whether bidder has submitted the required supporting documentation According to B101 (O+A), what form of dispute resolution must be tried before arbitration? - Mediation
Información del documento
- Subido en
- 7 de abril de 2024
- Número de páginas
- 25
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas