NFPA 24 Test (TFM10)questions well answered 2024/2025
NFPA 24 Test (TFM10)Combined Service Mains - correct answer This standard shall apply to ______ intended to carry water for fire service mains AHJ - correct answer Working plans shall be submitted for approval to the _____ before any equipment is installed or remodeled. Pressure-Regulating devices - correct answer ____ shall not be used Control Valves - correct answer ______ shall not be installed in the piping from the fire department connection to the fire service main Control Valves - correct answer _____ shall be permitted in the system downstream of the fire department connection Check Valve - correct answer When more than one water supply exists, a ___________ shall be installed in each connection Control Valve - correct answer All check valves shall have a ________ installed upstream and downstream of the check valve. 40 ft - correct answer A post indicator valve installed not less than____ from the building 32-40 inches - correct answer Where post indicator valves are used, they shall be set so that the top of each post is _______ above final grade not be required - correct answer Supervision of underground gate valves with roadway boxes shall ____________
Escuela, estudio y materia
- Institución
- Tfm
- Grado
- Tfm
Información del documento
- Subido en
- 29 de marzo de 2024
- Número de páginas
- 3
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
nfpa 24 test tfm10
Documento también disponible en un lote