CLC 222 Mod 3 Contract Management
CLC 222 Mod 3 Contract Management Exam •Here is your test result.The dots represent the choices you have made. •The highlighted questions are the questions you have missed. •Remediation Accessed shows whether you accessed those links.'N' represents links not visited and 'Y' represents visited links. Back to Status page contains 9 Questions 1)The Contracting Officer's Representative must read and understand the contract, including any attachments and modifications to the contract. [Recognize the basic information (period of performance, PWS, contract value) found in a contract to include the uniform contract format] False True 2)A separate Contract Line Item Number (CLIN) should be used for each item on a contract. [Identify methods of tracking contract obligations using ACRNS and CLINs in a contract] [Remediation Accessed :N] False True 3)What areas of the contract under the Uniform Contract Format specify schedule/delivery parameters for the COR? [Analyze contract schedule compliance, to include all SOW requirements and CDRL deliverables] All the answers are correct Section B – Supplies or Services and Prices/Costs Section C - Description/Specifications/Statement of Work Section F – Deliverables or Performance 4)A bilateral modification is used to . [Identify COR responsibilities supporting the planning and submission of contract changes documents needed to negotiate a modification] All of these answers are correct Make a change in the contract both parties agree with Make negotiated equitable adjustment to a change order Definitize a letter contract 5)An option is the unilateral right of the government to extend or buy more than the amounts bought at the time of award. [Determine if a change is within the scope of the contract.] False True 6)Contracting Officer's Representatives do not have authority to modify the contract; however, they are vital to the process as they are relied upon to notify the Contracting Officer of required contract changes and evaluating proposals. [Define the COR's role in the resolution of issues under the contract and his role in monitoring corrective actions] False True 7)During negotiations for a proposed change to the contract, the Contracting Officer may rely on the COR for technical reviews. [Recognize how the COR's responsibility for providing cost estimates assist KOs in negotiating proposed changes in scope of work under the contract.] True False 8)Common causes of a constructive change include: [Identify the common causes of constructive change] All these answers are correct Inadequate requirements documents
Escuela, estudio y materia
- Institución
- CLC 222 Mod 3 Contract Management
- Grado
- CLC 222 Mod 3 Contract Management
Información del documento
- Subido en
- 22 de marzo de 2024
- Número de páginas
- 7
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
clc 222 mod 3 contract management exam here i
Documento también disponible en un lote