API 1169. Study test questions test RM#2 with correct answers 2024/2025
According to OSHA a "protective system" is defined as: - Method of protecting employees from cave-ins. Design and development inputs shall be identified and reviewed for? - Accuracy, completeness and lack of conflict The Excavator calls the One Call Center prior to excavation at least - Two working days nor more than ten working days Encroachment Area is the area where the ground disturbance occurs within: - 50 feet of the centerline of the existing facility (or ROW) or other easement The pressure recorders and deadweight gauge shall be located at a safe distance at least: - 100 feet from the facility being tested In compliance with the Uniform Color Code the route and or area to be excavated shall be identified by: - White markers Markings may include one or any combination of the following: paint, chalk, flags, stakes, brushes, or offsets. Matching markings to existing and expected surface conditions is the responsibility of? - Facility Owner Subpart G of 49CFR192 prescribes minimum requirements for: - Construction of transmission pipelines and mains. If a newspaper was seeking information about the project, are inspection personnel allowed to interac with them to answer their questions? - Only if expressly allowed Before placing new gas pipelines in service all piping and components must be subjected to: - 125% of MOP (maximum operational pressure) of the system for 4 hours A detailed design developed from operating requirements and conforming to Code requirements including all necessary drawings and specifications, goveming a liquid petroleum pipeline installation is also known as? - Engineering design Planned, systematic, and preventative actions that are required to ensure that materials, products and services will meet specified requirements is called? - Quality Control system Any physical objects detected by an in-line inspection device that may be anomalies, components, nearby metallic objects, or some other item are also known as? - Features Which describes "rework" the best? - Any grinding or welding on a completed weld to correct potentially rejectable indications General basic requirements for Chief Inspector qualification are? - Environmental and pollution control What type of hazard is a waterway crossing? - Site-Specific What would a continuous run of pipe between adjacent blocks valves be called? - A pipeline section Does a section of pipe removed and scheduled for reuse, but then reinstalled in the same loca need to be retested? - No testing required In intemational codes and standards, this is often referred to as the maximum steady state op pressure or maximum allowable operating pressure - Operating pressure limit The letter "I" identifies shipping names appropriate for: - .Describing materials in intermational transportation Who is responsible for all safety on the job site? - Contractor What identifies hazards that necessitate the use of PPE? - JSA Which is an example of a sustained load? - The weight of the pipeline including components, fluids, and slurries What is the standard of acceptance for welds of piping systems operating at hoop stress levels 50% of the SMYS? - ASME B31,8 In regards to road and highway use, what should the Inspector be aware of? - Size and weight restrictions for heavy equipment It is not necessary to vary the design stress for metal temperatures between what range? - -20°F and 250°F Which pressure test is designed to establish the operating pressure limit of a pipeline? - Strength pressure test What is LOTO? - A practice to prevent exposure to all hazards Where shall the requirements for verifying conformance with applicable product quality plans be included during production? - Shop routers or travelers What would be considered a mechanical property of a finished weld? - Ductility
Escuela, estudio y materia
- Institución
- API 1169.
- Grado
- API 1169.
Información del documento
- Subido en
- 16 de marzo de 2024
- Número de páginas
- 7
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
api 1169 study test
-
api 1169
-
api 1169 study test questions test rm2
-
api 1169 study test questions test
Documento también disponible en un lote