ICC Test With Complete Questions and Answers latest 202425 Version
ICC Test With Complete Questions and Answers latest 202425 Version Phase 1 equipment is related to all of the following except: Dispenser mounted vapor recovery equipment According to EO VR-201/202-N, the only authorized hose configuration is: Any Hose Configuration The most current ARB approved Phase II vapory recovery is: EVR When a certified Healy Technician is replacing the VP 1000 during operational hours, they should do all of the following to eliminate the potentials problem except: review service with gas station operator The following component is not part of the Healy Phase II vapory recovery system: Healy Model 900 Vapor Motor The max dispensing flow rate of a Healy 900 Series EVR nozzel is: 10 GPM According to VR-201/202-N, a _____ should be installed on the Healy system if the flow rate is above 10 GPM Flow limiter The Quarterly Inspection and Testing of a Healy Phase II EVR system should include the following except: conduct a pressure decay test by a Healy Certified Technician The first sign of oxygen depletion is: accelerated breathing and heartbeat According to PEI 500, each of the following are proper methods of removing a portion of a GDF from service except: noting event in the defective equipment log What procedure checks the integrity of the vapor check valve in the nozzle? Nozzle bag test Which of the following conditions is a Healy certified technician not required to repair? Reconnection of a breakaway after a drive off What procedure is required after a nozzle spout change? Nozzle automatic shutoff test A vapor recovery system generally uses what unit of measurment? Inches of water column During the annual inspection and testing of the vapor recovery system; the first three steps are to: a) Conduct static pressure performance of the Healy Clean Air Separator b) Conduct pressure decay test c) Conduct dispenser vapor line tightness test What is the 4th step? Conduct V/L test on all nozzles What is the lower limit of acceptable V/L for a nozzle? .95 In order for a technician to be authorized to clear an ISD Alarm, he or she must be certified by which of the following? Manufacture The Clean Air Separator belongs to which system? Healy Phase II All of the following items should be on hand to react to a spill except: Class A fire extinguisher Which is not a component of a Healy phase-II vapory recovery system? Universal 37 Which of the following is not part of hanging hardware? Husky Model 4885 What is mounted on the top of the manifold vent mast? Pressure/vacuum vent cap Connecting a copper wire from the tank to the earth constitutes what? Grounding What is the maximum allowable fuel flow from the dispenser? 10 GPM What is the maximum length of the hose/breakaway/swivel when measured to the base of the nozzle? 20 feet Compounds with a high vapor pressure, such as gasoline, will evaporate readily and will typically: have a low flash point A liquid removal device should be installed on a balance system at: the low point of the hose between the vehicle and dispenser with the nozzle in the vehivle The vapor flows through the following paths on a balance system, except inter hose ______ has recently re-written the regulations governing VR systems in California (enhances vapor recovery) CARB Which is not part of a Phase I system? clean air seperator A breakaway reconnection must be logged on: GDF maintenance log The Phi-Tite rotatable adapters are not field serviceable except: vapor poppet The ISD system shall maintain an electronic archive of monthly reports for a period of: 12 months Lubricating the o-ring or Quad Seal before installing the hose assembly into a breakaway nozzle with: motor oil The insertion interlocks on a balance system nozzle: prevent fuel from dispensing unless the bellows are compressed Following a start-up, the spill container drain valve on the Phil-Tite should be tested every: 3 years When conducting a nozzle bag test, use any plastic bad large enough to enclose the nozzle while not having a thickness greater than 2 mils on: both nozzles on the dispenser The Healy 900 Series Nozzle consists of all of the folloiwing parts except: Bellows The Healy Clamp (795) is used to connect: the breakaway A combustible gas indicator (CGI) measures: flammable vapors (LEL) A Level II Qualified Person is trained to evaluate and perform the following functions except: replacing nozzles What tests are not required after a breakaway is reconnected? Vapor motor What protects the hanging hardware from excessive force? Breakaway Which of the following isn't part of the quarterly inpection? Pressure decay test What is the proper way to clean up a small gas spill? Pick it up w/absorbent material and dispose of it properly What procedure is not required during a vapor motor replacement? Replacement of nozzle When may a vapor recovery system component be substituted for a regular component? When the part number is listed as a certified component on the Executive Order Differences in vapor recovery guidelines may depend on Different standards between different regulatory agencies What is not post of the Healy Phase I EVR vapor recovery system? Clean Air Seperator What is not part of the Healy Phase II EVR vapor recovery system? Shear valve
Escuela, estudio y materia
- Institución
- ICC
- Grado
- ICC
Información del documento
- Subido en
- 13 de marzo de 2024
- Número de páginas
- 4
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
icc test with complete questions and answers lates
Documento también disponible en un lote