SAFe Agile Scrum Master Study Guide fully solved graded A+
SAFe Agile Scrum Master Study Guide ART - correct answer Agile Release Train PO - correct answer Project Owner PI - correct answer Program Increment Innovation and Planning Iteration - correct answer Occurs every PI and serves multiple purposes. It acts as an estimating buffer for meeting PI objectives, as well as providing dedicated time for innovation, continuing education, and PI planning and Inspect and Adapt (I&A) events. Inspect & Adapt (I&A) - correct answer A significant event, held at the end of each PI, where the current state of the solution is demonstrated and evaluated by the train. Teams reflect and identify improvement backlog items via a structured, problem-solving workshop Iteration - correct answer A basic building block of Agile development. Each is a standard, fixed-length timebox, where Agile Teams deliver incremental value in the form of working, tested software and systems. What is the recommended timebox duration for an Iteration? - correct answer 2 weeks; however, 1-4 weeks is acceptable, depending on the business context. Who participates in the Inspect & Adapt (I&A) phase? - correct answer All stakeholders, including: 1. The Agile Teams 2. Release Train Engineer (RTE) 3. System and Solution Architect Engineering 4. Product Management, Business Owners, and others on the Train
Escuela, estudio y materia
- Institución
- SAFe Agile
- Grado
- SAFe Agile
Información del documento
- Subido en
- 5 de marzo de 2024
- Número de páginas
- 10
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
safe agile scrum master study guide
Documento también disponible en un lote