Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 11 páginas
Examen

UPDATED Lean Six Sigma Green Belt Certification QUESTION AND ANSWER 2023//2024

Document preview thumbnail
Vista previa 2 fuera de 11 páginas

What is Six Sigma? - ANSWER is both a methodology for process improvement and a statistical concept that seeks to define the variation inherent in any process. The overarching premise of Six Sigma - ANSWER is that variation in a process leads to opportunities for error; opportunities for error then lead to risks for product defects. Decision-making with Six Sigma - ANSWER The six sigma method lets organizations identify problems, validate assumptions, brainstorm solutions, and plan for implementation to avoid unintended consequences. What is 6σ as a statistical concept? - ANSWER is a statistical representation of what many experts call a "perfect" process. Technically, in a six sigma process, there are only 3.4 defects/1,000,000 opportunities, or 99.99966% of the products from six sigma are without defect. Common six sigma principles - ANSWER - Customer-focused improvement - Value streams - Continuous process improvement - Variation - Removing waste - Equipping people - Controlling the process Value stream - ANSWER is the sequence of all items, events, and people required to produce an end result Jidoka - ANSWER a principle that creates control of defects inside a business. Jidoka demands that a process stop as soon as errors are detected instead of identifying defects at the end of the production line and attempting to trace errors back to a source. Principles of Lean Six Sigma - ANSWER - Defining customer values - Identifying the value stream for customer needs and desires - Identifying waste in the process - Creation of a continuous process flow - Continually working to reduce the number of steps and time it takes to reach customer satisfaction Rummler-Brache's Nine Box Model - ANSWER - Improvement-planning - Definition - Analysis and Design - Implementation - Management of process - Processes are turned over to daily teams Scrum - ANSWER is a project development method specific to Agile programming endeavors in technical departments. When to use six sigma - ANSWER - When facing the unknown - When problems are widespread and not defined - When solving complex problems - When costs are closely tied to processes Other formal quality or process improvement programs - ANSWER - Lean Process Management - Total Quality Management - Business Process Reengineering - Rummler-Brache - Scrum - The Customer Experience Management Method - JumpStart Muda - ANSWER Waste that fails to add value to a product or process as defined by the customer or end-user. The Seven Muda or Wastes - ANSWER - Overproduction - Correction - Inventory - Motion - Conveyance - Over-processing - Waiting Muda of Overproduction - ANSWER A product, part, or service was produced too fast, at the wrong time, or in too much quantity for the process. Muda of Correction - ANSWER Reworking an end product to eliminate defects. Muda of Inventory - ANSWER When materials or inputs stack up before a step in the process. Muda of Motion - ANSWER How employees themselves move during a process. E.g: The half a second it takes for data entry employees to toggle between two windows could cost the company x amount of dollars depending on salary. Muda of Conveyance - ANSWER Involves the movement of outputs, products, or resources. E.g: If the glue that binds doll eyes to doll faces is kept in an inventory room, and carried, as needed, to the process. Muda of Overprocessing - ANSWER When an employee or process inputs more resources into a product or services than is valued by the customer. E.g: When an office worker delves deep into insurance verification, spending an hour on the phone with the company to get detailed benefit information. Muda of waiting - ANSWER Refers to any idle time in a process, whether that time is for machinery or for people. Other forms of waste - ANSWER - Talent - Ideas - Capital/Cash Type I Muda - ANSWER Non-value added tasks that might actually be essential or required by circumstances E.g: Inspection of products during a process if the process is known to produce defects. Type II Muda - ANSWER Non-value added tasks that are not essential and can be immediately removed from a process. 5S - ANSWER a Japanese Lean approach to organizing a workspace, so that by making a process more effective and efficient, it will become easier to identify and expunge muda.


Información del documento

Subido en
26 de febrero de 2024
Número de páginas
11
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$11.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
contenthive76
2.8
(5)
Vendido
65
Seguidores
34
Artículos
1929
Última venta
5 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.