CMIT Practice Test | 100% Correct Answers | Verified | Latest 2024 Version
The contract documents for a project should be written primarily to protect the interest of the CM. - False The owner, CM and Designer are less likely to be involved in disputes with the Contractor if a contract is awarded to the lowest bidder. - False Use of standard forms of agreement will always result in fewer disputes? - False After the owner accepts a cm's proposed GMP as contemplated by the CMAA CM at Risk Series documents, the responsibilities and duties of the CM are essentially the same as if the Owner and CM were using the AIA GMP documents. - False In the CMAA CM at Risk series documents, the CM may perform part of the work if the CM so chooses? - False Contractors generally believe the Designer acts independently and in the joint interests of the Owner and Contractor when making decisions regarding contract claims and change orders. - False The CMAA standard forms of agreements(Agency- or CM at risk series) are the best documents for an Owner to use on all design and construction projects. - False
Escuela, estudio y materia
- Institución
- CMIT
- Grado
- CMIT
Información del documento
- Subido en
- 26 de febrero de 2024
- Número de páginas
- 9
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
cmit practice test 100 correct answers verifi
Documento también disponible en un lote