ACI Concrete Field Testing Technician- Grade I Exam Questions And Answers 100% Verified
ACI Concrete Field Testing Technician- Grade I Exam Questions And Answers 100% Verified The temperature of concrete may be measured in a wall form. True or False - answerTrue The sensor of the temperature measuring device shall be submerged a minimum of _____ in. into the freshly mixed concrete. - answer3 in. Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True or False? - answerTrue The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - answer1 degree F, 30 degrees F to 120 F The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - answerAnnually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? - answerTrue A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True or False? - answerFalse What must be done to the sample container prior to sampling the concrete? - answerDampen with water What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete. - answerGently press the concrete around the temperature measuring device at the surface of the concrete How long must the temperature measuring device remain in the freshly mixed concrete? - answerAt least 2 minutes but not more than 5 minutes After the temperature of the concrete is read, what is required? - answerReporting of temperature The temperature of concrete is reported to the nearest _____ degrees F - answer1 degree F According to ASTM C1064, what is one reason to take the temperature of concrete? - answerVerify conformance to a specified requirement for temperature of concrete A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True or False? - answerFalse This method covers sampling from four types of mixtures which are _____, _____, _____, and _____. - answerStationary mixers, paving mixers, revolving drum mixers, and open top mixers The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. - answer15 The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes. - answer5 The molding of strength test specimens shall begin within _____ minutes after fabricating the composite sample. - answer15 The concrete sample must be protected from sources of _____ and _____. - answercontamination and rapid evaporation The minimum size sample for making strength test specimens is _____. - answer1ft^3 When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch - answer2 The composite sample for a paving mixer must represent a minimum of _____ different portions of the batch of concrete taken from the pile after discharge. - answer5 When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____ regularly spaced intervals during discharge of the middle portion of this batch. - answer2 Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the job site. True or False? - answerFals
Escuela, estudio y materia
- Institución
- ACI Concrete
- Grado
- ACI Concrete
Información del documento
- Subido en
- 25 de febrero de 2024
- Número de páginas
- 9
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
aci concrete field testing technician grade i exa
Documento también disponible en un lote