Appian Analyst and Business Section Questions and answers 100% guaranteed PASS
There are 3 types of user interfaces: - ANSWER- Tempo : end user experience and has 5 tabs - Sites: allow users to focus on a limited set of activities - Embedded: Reports can display data by: - ANSWER- Grids - allows paging and filtering - Graphs o Pie o Bar o Line Reports aggregate data from: - ANSWER- Records - Databases - Process Analytics - Third Party Systems Acceptance Criteria - ANSWERDetails that indicate the scope of a user story and help the team and product owner determine done-ness. Epic - ANSWERA very large user story that is eventually broken down into smaller stories; epics are often used as placeholders for new ideas that have not been thought out fully. There's nothing wrong with having an epic, as long as it is not high priority. Activities During Sprint0: - ANSWER- Chartering - Story Creation - Definition of Ready -Definition of Done -Story Mapping - Story Sizing -Sprint Cadence -Personas What is Definition of Ready? - ANSWERA user story should meet these criteria before it can be included in a sprint Example: - Story points assigned -Story written -Test plan defined - Acceptance criteria defined What is Definition of Done? - ANSWERA user story should meet these criteria before it can be considered complete. Example: -Unit Tested - Code reviewed - Documentation written ScrumMaster - ANSWERRemoves blockers and ensures that the team follows an agile methodology Analyst - ANSWERDefines user roles and responsibilities Lead Designer - ANSWERDesigns the solution that meets analyst requirements and performs at scale Designer - ANSWERBuilds the application Tester - ANSWERMakes sure what a designer builds functions correctly to meet analyst requirements Developer - ANSWERBuilds custom plugins in Java Product Owner - ANSWERPrioritizes the backlog User stories - ANSWERDescribe a requirement from the user perspective Story points - ANSWERA way to measure the complexity of work Sprint - ANSWERDefined period of time when work gets done Sprint review - ANSWERMeeting held at the end of each sprint to go over what was accomplished Backlog - ANSWERPrioritized list of features that need to be delivered How many columns can an interface have? - ANSWER2 Process - ANSWERThink about the different steps necessary to collect data Interfaces - ANSWERConsider the most logical and easiest way for users to input information Persona - ANSWERThink about the likes, dislikes, and needs of each user role defined by the business Reports - ANSWERThink about which visualizations work best display data in aggreagate Data - ANSWERConsider reporting and auditing requirements News - ANSWERConsider which events in the process will enable the most collaboration among users Content Developers - ANSWER-Create new content -Manage existing content -Collaborate on content Content Dev Management - ANSWER-View existing content -View summaries of total content (reports) Administrators - ANSWER-Manage application security and lifecycle In Quick Apps, does the Attachment option exist in every quick app automatically? - ANSWERTrue You can make changes in the Appian Designer and still be able to make changes in the Quick Apps Designer - ANSWERFalse User and groups are used for? - ANSWERo Defining security o Task Assignments o News Posting What are the two types of users? - ANSWERBasic and System Adimistrators Basic Users - ANSWERBy default, users only have access to: tempo and sites System Administrators - ANSWERo Can't delete users, but you can deactivate them o Can only add users to group in the Appian Designe
Escuela, estudio y materia
- Institución
- Appian Analyst and Business
- Grado
- Appian Analyst and Business
Información del documento
- Subido en
- 17 de febrero de 2024
- Número de páginas
- 7
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
appian analyst and business section questions and