CONSTRUCTION SITE FIRE SAFETY MANAGER RADIANT TEST 100% Solved
CONSTRUCTION SITE FIRE SAFETY MANAGER RADIANT TEST 100% Solved It is a best practice that the location of the first responder box be determined in coordination with the ______ -Answer-Borough Dispatch The construction site fire safety manager shall conduct an inspection of the construction site and all fire safety measures at least on a (an) ______ basis -Answer-Daily It is a best practice that the emergency contact list found in the first responder box should include the phone number of the ______ -Answer-Electrical Subcontractor Contact What type of plan is required for the construction site? -Answer-Pre-fire Plan During roofing operations, there shall be one multi-purpose portable fire extinguisher with a minimum ______ rating on the roof being covered or repaired -Answer-3-A 40- B:C What type of fence shall be used to enclose storage areas used for aerosol products? - Answer-Chain-link All compressed gas cylinders must be stored ______, capped and secured. -Answer- Upright Which of the following is correct concerning proper storage of aerosol products at construction sites? -Answer-A chain-link fence shall be used to enclose the storage space
Escuela, estudio y materia
- Institución
- CONSTRUCTION SITE FIRE SAFETY MANAGER RADIANT
- Grado
- CONSTRUCTION SITE FIRE SAFETY MANAGER RADIANT
Información del documento
- Subido en
- 12 de febrero de 2024
- Número de páginas
- 6
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
construction site fire safety manager radiant test