100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

DOD 5105.21 Volume 2

Puntuación
-
Vendido
-
Páginas
5
Grado
A+
Subido en
12-02-2024
Escrito en
2023/2024

DOD 5105.21 Volume 2 Physical security standards for the construction and protection of SCIFs are prescribed in which Intelligence Community Directives (ICDs)? Intelligence Community Directive (ICD) 705, 705-1, and 705-2. T or F. If a SCIF is physically located within a restricted area, it does not also need to be designated as a controlled area. True SCIFs built under Chief of Mission (COM) control will follow whose guidelines? Department of State Where will SCIF main entry point combinations and bypass keys, if applicable, will be stored? in a different SCIF of the same or higher accreditation. The facility's location (complete address) and identity as a SCIF shall be protected at a minimum of what level classification? FOR OFFICIAL USE ONLY (FOUO) Waivers are normally granted for a period of what time? They are granted up to 1 year or until such time as the waiver is no longer needed. What is the first critical element in the establishment of a SCIF? Concept Approval DoD SCIFs established within diplomatic facilities fall under the security responsibility of what? Chief of Mission (COM) What are the two types of temporary SCIFs? Temporary Secure Working Area (TSWA) and T-SCIF A TSWA must not be used more than __ hours per month and no longer than __ months in the same location. 40; 12 What are used in support of tactical, contingency, and field-training operations for a limited time where physical security construction standards associated with permanent facilities are not possible? T-SCIFs How early, at a minimum, must elements establishing or operating a T-SCIF within a deployed theater will notify the respective Combatant Command SSO? 48 Hours Who is the sole accrediting authority for physical and technical (TEMPEST) security for permanent SCI facilities? DIA Counterintelligence and Security Office (DAC) What facilities are accredited and used for handling, discussing, and processing but SCI is not stored in them? Secure Working Areas (SWAs) This type of SCIF is staffed and operated 24 hours a day, 7 days a week. Continuous Operations SCIF Open Storage Allows SCI to be openly stored within the SCIF without using GSA-approved storage containers An SCI-indoctrinated ___ shall be designated by the component SSO for each new construction or renovation project. Site Security Manager (SSM) The DAC is the accrediting official for DoD SCI facilities, excluding those under whose cognizance? NGA, NRO, and NSA Upon receipt of the concept approval, DAC will assign a ____ in order to track future correspondence and forward this to the requestor through their chain? SCIF ID What are the primary documents in the decision-making process for granting a final accreditation? Intelligence Community Standard (ICS) 705-1, and the Aircraft/UAV Accreditation Checklist and Shipboard (Surface/Subsurface) Accreditation Checklist What is the last step in obtaining the accreditation of a new SCIF or the reaccreditation of an existing SCIF? Acceptance of the accreditation package An existing SCIF must be reaccredited when a change occurs in any of the following areas: 1. SCIF perimeter (i.e., expansion or downsizing), 2. storage requirements (i.e., closed storage to open storage), 3. change from continuous (24 hours) operations to open or closed storage. How soon must the SSO report to DAC and the appropriate CSA, their designee, or the DoD Component SIO, through SSO chain of command, all changes affecting the security posture of any SCIF. 24 Hours When a SCIF is no longer required, the local SSO will initiate withdrawal of accreditation and forward a copy of the request to whom? the appropriate head of an intelligence community element (HICE) or designee What occurs when a SCIF owner or sponsor identifies a need to temporarily shut down SCI activities? Caretaker status How long does the SCIF have to obtain a reaccreditation and be authorized to resume normal SCI operations once approved for caretaker status? up to 1 year True or False: The SSO may approve unclassified photography inside a SCIF. True SF 701 and 702 will be retained for how long? 90 days or as required by investigative purposes. How often will SSO, SSR, or properly SCI-indoctrinated designees conduct random inspections? at least monthly

Mostrar más Leer menos
Institución
DOD 5105.21 Volume 2
Grado
DOD 5105.21 Volume 2









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
DOD 5105.21 Volume 2
Grado
DOD 5105.21 Volume 2

Información del documento

Subido en
12 de febrero de 2024
Número de páginas
5
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$11.48
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
QUICKEXAMINER Walden University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
89
Miembro desde
2 año
Número de seguidores
44
Documentos
5449
Última venta
4 días hace
QUICK EXAMINER

Looking for high-quality study materials to help you excel? You’re in the right place! I provide well-structured notes, summaries, essays, and research papers across various subjects, all designed to make studying easier and more efficient. Why Choose My Materials? ✔ Comprehensive and well-organized content ✔ Easy-to-understand explanations ✔ Time-saving summaries for exams and research ✔ Carefully curated to ensure accuracy and clarity Each document is crafted to provide valuable insights, helping you grasp concepts quickly and effectively. Whether you're preparing for exams, writing an assignment, or just need clear and concise notes, my resources will support your academic journey. Browse my collection and take your studies to the next level

Lee mas Leer menos
3.6

15 reseñas

5
5
4
5
3
2
2
0
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes