BECC MOD 1 TEST questions and answers latest top score.
BECC MOD 1 TEST questions and answers latest top score. What ARE 3 considerations when dealing with electrical burns? - correct answer. Electrical current may burn a large area just below the surface Perform CPR if needed Treatment is the same as for a thermal burn (True/False) Section 300 of the PQS book list infrequent task and abnormal conditions. - correct answer. TRUE The overall purpose of PQS is to ...... - correct answer. provide a means to qualify ships personnel. (True/False) PQS provides an effective way to monitor an individual's qualification progress. - correct answer. TRUE When can your Final Qualification Page be signed?. - correct answer. After all line items have been completed and signed Vocabulary used in each qualification can be found in the ....... Section of the PQS book. - correct answer. FUNDAMENTALS Progress and completed qualifications of each person in the division are displayed on/in the ....... - correct answer. PROGRESS CHART Who is the final qualification authority? - correct answer. COMMANDING OFFICER A five inch outside micrometer will measure objects that are ....... inches thick. - correct answer. 4-5IN A Dial indicator may be used to....... - correct answer. ALIGN MACHINERY It is NOT safe to operate electrical power tools in areas where ....... is/are present. - correct answer. FLAMMABLE GASES Electrical power tools must be inspected prior to issue by a qualified ....... - correct answer. ELECTRICIAN A torque wrench is used to measure the tightness of ... - correct answer. FASTENERS Torque wrenches are considered ....... equipment - correct answer. PRECISION If a maintenance procedure does not specify a torque sequence, utilize the recommended sequence found in ....... - correct answer. NTM CHAPER 075 Which document contains maintenance requirements pertaining to all equipment in a command? - correct answer. PMS MASTER FILE 16. Which portion of the PMS Master File provides the work center supervisor a ready reference of planned maintenance requirements.? - correct answer. WORK CENTER PMS MANUAL If a planned maintenance action cannot be completed in accordance with the steps listed on the MRC, the maintenance man should ....... - correct answer. STOP AND REPORT TO THE WCS What is used to notify personnel that death or injury may result if the operating procedures and practices are NOT correctly followed? - correct answer. Warnings Which of the following serves as the "Table of Contents" for the Work Center PMS manual? - correct answer. LIST OF EFFECTIVE PAGES (LOEP) The SYSCOM Control Number assigned for each maintenance requirement listed in a MIP must match the number on the corresponding - correct answer. MRC (maintenance requirement card) Materials needed to perform the required maintenance are found on the - correct answer. FRONT OF THE MRC The responsibility to replace a missing MRC belongs to the ....... - correct answer. WORK CENTER SUPERVISOR Who assists the Department Head in managing maintenance at the division level? - correct answer. DIVISION OFFICER Who has the responsibility to maintain the list of effective pages? - correct answer. WORK CENTER SUPERVISOR Which schedule is NOT used in the 3M system? - correct answer. DAILY Which of the following periodicity code is used when a maintenance requirement is performed monthly? - correct answer. M Which document is use to verify that you have the proper MRC? - correct answer. MIP (MAINTENANCE INDEX PAGE) You must check the ...... to ensure that the weekly schedule is correct. - correct answer. QUARTELY SCHEDULE Material needed to perform a specific PMS action is listed on the ...... - correct answer. MRC (MAINTENANCE REQUIREMENT CARD) The maintenance procedure steps on the MRC are - correct answer. TO BE FOLLOWED PRECISELY The shipboard hazardous material list is provided ...... on the Department of Defense's CDROM. - correct answer. QUARTERLY Requirements for storage of hazardous material are found on the ...... - correct answer. MSDS While grinding or chiseling, what should be used to protect the eyes? - correct answer. CHIPPING GOGGLES Which procedure does NOT require eye protection? - correct answer. NORMAL OPERATION OF A LUBE OIL SYSTEM Who is responsible for ensuring that PMS is performed on eyewash stations? - correct answer. DIVISION OFFICER Which of the following tags/labels prohibits operation of equipment that could endanger personnel or equipment? - correct answer. DANGER TAG Maintenance aboard ship is the responsibility of the ....... - correct answer. SHIPS FORCE An out of calibration pressure gauge must be recorded in section ...... of the Tag-Out log. - correct answer. FOUR What type of activity consists of non-crew members involved in the construction or maintenance of the ship? - correct answer. REPAIR ACTIVITY The Instrument Log is a sequential listing of all labels issued for ....... and ....... instruments. - correct answer. OUT OF COMMISION., OUT OF CALIBRATION All "Cleared" Danger/Caution tag-out Record Sheets are filed in section five until ....... - correct answer. THE NEXT TAG OUT AUDIT (True/False) The second person signing the tags may accompany the person attaching the tags? - correct answer. FALSE
Información del documento
- Subido en
- 7 de febrero de 2024
- Número de páginas
- 6
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas