100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

PMP EXAM QUESTIONS AND CORRECT ANSWERS WELL RATED AND UPDATED

Puntuación
-
Vendido
1
Páginas
72
Grado
A+
Subido en
05-02-2024
Escrito en
2023/2024

PMP EXAM QUESTIONS AND CORRECT ANSWERS WELL RATED AND UPDATED

Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Grado

Información del documento

Subido en
5 de febrero de 2024
Número de páginas
72
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PMP EXAM QUESTIONS AND CORRECT
ANSWERS WELL RATED
AND UPDATED

The critical element in a project's communication system is the:
Progress report
Project directive
Project manager
Customer Correct Ans - Project manager

, PMP EXAM QUESTIONS AND CORRECT
ANSWERS WELL RATED
AND UPDATED


Project scope is:


All the work that must be done in order to deliver a product according to the specified
features and functions, only.


The features and functions that are to be included in a product or service. A
narrative description of work to be performed under contract.
All of the above Correct Ans - All the work that must be done in order to
deliver a product according to the specified features and functions, only.


The most important criteria in deciding to initiate a project selection method is:


Stakeholder's vision
Low cost opportunity
Environmental consideration


Capability Correct Ans - Environmental consideration Which
of the following is not a General management technique? Make-or-buy
analysis
Analysis of alternatives
Applying PMBOK concepts
Lateral thinking Correct Ans - Make-or-buy analysis


As a project manager you have successfully delivered all project deliverables within
stipulated timelines - your senior management wants you to calculate the Cost of
Quality - as a project Manager what costs would you NOT consider while making this
calculation?

, PMP EXAM QUESTIONS AND CORRECT
ANSWERS WELL RATED
AND UPDATED

A. Cost of Hiring
B. Prevention costs
C. Appraisal costs
E. External and InternalFailure costs Correct Ans - A Cost of Hiring


All of the above are correct - except option A - since Hiring Costs have nothing to do
with Cost of Quality.

, PMP EXAM QUESTIONS AND CORRECT
ANSWERS WELL RATED
AND UPDATED


What is the BEST use of the Work Authorization System?


It manages the timing and sequence of when activities need to be performed It
manages who performs the activity
It identifies the resources needed to complete activities


It is used for comparing actual work against the baselines Correct Ans -
It manages the timing and sequence of when activities need to be performed


It defines how work will be authorized and how work will be done at the right time and
in the right sequence


You are managing a project that your company won after making a bid. The clients
have negotiated long and hard and have driven a hard bargain. The project is schedule
to span over eight months and you are in your fifth month of execution. You are
extremely worried since you have about four more months of work remaining and the
project is at the "Point of total assumption" - what does this mean?


As a seller you are running behind schedule As
a seller you are ahead of schedule
The project is going to have a cost overrun which will need to be negotiated with the
client


As a sellter all subsequent costs will have to be borne by the sellter
Correct Ans - As a seller all subsequent costs will have to be borne by the
seller


Reason: "Point of assumption" is the point at which the seller has consumed all the
$20.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
jameswest Chamberlain College Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
48
Miembro desde
4 año
Número de seguidores
49
Documentos
2189
Última venta
1 año hace

3.4

7 reseñas

5
3
4
1
3
1
2
0
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes