GCSS-Army ERPS's Course Test 1 (2024/2025) Already Passed
GCSS-Army ERPS's Course Test 1 (2024/2025) Already Passed 1. A __________ is a GCSS-Army component that represents a particular Army Unit, logistics element, or cost capturing entity. a. Force Element (FE) 2. Which transaction code (T-Code) is used to display a Unit's Organizational structure? (Force Element, Storage Location, Property, Personnel, and what a unit is allowed to request) c. /n/ISDFPS/LSP2 3. Which transaction code (T-Code) is used to identify the details associated with a DoDAAC, MRP area, Storage Location, and supporting supply organization. d. ZFE 4. True or False? A Technical Status is set by the User to identify the severity of a notification (fault or shortcoming) for a piece of equipment. a. True 5. Which operational status symbol is used to indicate the equipment non-mission due to a maintenance requirement? c. Red Flag 6. Work orders are created and managed from the Equipment Situation Report. Which of the following represents a refurbishment order? b. PM04 7. True or False? A functional location structure is a hierarchical structure representation of a system/sub-system/end item. a. True 8. Using the Functional Location Structure example below; which equipment is currently NOT installed into the Functional Location Structure? d. The transmission 9. Which notification type is used to create a one-time individual equipment dispatch? b. D1 10. Which transaction is used to display the workflow message indicating the approval authority's equipment dispatch request decision? d. SBWP 11. Which transaction code (T-Code) is used to create a project work order? d. IW31 12. Which of the following work centers is never entered in the Main Work Ctr field of a work order? d. A Commodity Shop work center being assigned work 13. What triggers the dismantle/install process? c. Goods movement for a work order 14. After the technical completion button in the overall completion process is selected, how is the operational status updated? c. The Set User Status dialog box prompts the User to update the operational status 15. General maintenance task lists define which requirement for a maintenance task or activity? c. Both A & B 16. True or False? The Service schedule displays the date in which the maintenance call was completed as well as the maintenance calls that are due for processing? a. True 17. Which aging indicator displays in the Recoverable/Reparable Conversion by Material (YOBUX) transaction if the return (ZRL or ZRX) PR is 15 days olds? b. Yellow 18. True or False? When executing the MI24 transaction, you are in search of open active inventories. a. True 19. Which Action, Reference Document, and Movement Type posting selections are used to post goods issue bench stock material to a Unit's Cost Center? a. A07 Goods Issue, R10 Other, and 201 20. Which of the following items are not displayed in the Order Status Report? d. The mode of shipment
Escuela, estudio y materia
- Institución
- GCSS-Army ERPS\'s
- Grado
- GCSS-Army ERPS\'s
Información del documento
- Subido en
- 2 de febrero de 2024
- Número de páginas
- 4
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
gcss army erpss course test already
Documento también disponible en un lote