Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

6 Sigma Green Belt Certification Exam Review practice testwith complete verified solutions 2024 latest update

Puntuación
-
Vendido
-
Páginas
41
Grado
A+
Subido en
01-02-2024
Escrito en
2023/2024

________ survey questions allow for quantitative analysis closed ended Value stream maps help identify all of the following sources of waste, bottlenecks, material & information flow, improvement opportunities Brainpower Read More Previous Play Next Rewind 10 seconds Move forward 10 seconds Unmute 0:07 / 0:15 Full screen The Fishbone diagram is part of the ________ phase of the Define, Measure, Analyze, Improve, and Control (DMAIC) cycle. analyze When creating a control plan, you should consider which of the following items? process maps, key inputs process, targets and specifications, key process inputs, control limits, important noise variables, capability analysis process Tree Diagrams have a limit on the level of detail that can be analyzed. FALSE Reliable data is needed to Establish a baseline against which improvements will be measured Measure progress Another name for a Fishbone diagram is: cause and effect diagram The most effective ways to assess control plan effectiveness are: Dashboard or scorecard metric performance Audits of the control system Which of the following are meetings roles? timekeeper, coach, scribe, gatekeeper A baseline analysis establishes a control method for a problem FALSE In order to do effective benchmarking, you must visit each company to look at each process in person. FALSE The word "value" in value stream mapping is defined as the activities required to provide a customer with a quality product or service FALSE Which three questions determine if a process step adds value? Check all that apply does customer care, does step change product, can we do the step right everytime Which one of the items below does not represent good team dynamics low risk An example of a control poka yoke is building a spreadsheet that will not calculate totals until all data has been entered TRUE Which acronym best describes what is included in an effective team meeting? SPACER (Safety, purpose, agenda, control of conduct, expectations, roles and responsibilities) Root cause analysis is qualitative All projects and initiatives need to be chartered, whether it's a short cycle quick hit or a complex, multi-layered improvement TRUE Creating consistent repeatable processes is the goal for which Lean tool standard work Customer Needs Mapping, surveys, and Quality Function Deployment (QFD) are tools used in the _____ phase of the Define, Measure, Analyze, Improve, and Control (DMAIC) cycle define When calculating a Risk Priority Number, a high rating on the detectability rating scale means the current process controls are not likely to detect the potential cause or failure mode TRUE If you were trying to identify world-class customer service processes, you would deploy strategic benchmarking To establish a baseline, you can Obtain data from the current performance level of the process Review best demonstrated practices (BDPs) at other divisions Benchmark other companies and industries with similar processes After the forming and storming stages, an effective team understands all of these except root cause A failure mode can have multiple causes TRUE The horizontal axis of a Pareto chart reflects categories Quality Function Deployment (QFD) is a system for translating customer requirements into the appropriate internal requirements TRUE Management by Fact (MBF) is a one-time event that is completed as the start of a productivity improvement project FALSE A standing team charter focuses on broad, ongoing business issues TRUE Ad hoc teams typically do not have a specific time frame to complete their mission FALSE All of the following are steps to create a Fishbone diagram 1. name the problem 2. decide major categories 3. brainstorm 4. review diagram 5. discuss the final diagram 6. develop plans The team leader is responsible for initiating the charter process FALSE Which item listed is not part of a team charter analysis tools When collecting data for a Measurement Systems Analysis (MSA), it is important that the data is collected independently and in _______ order random Measurement System Analysis (MSA) is part of the _______ phase of the Define, Measure, Analyze, Improve, and Control (DMAIC) cycle measure ___________data yields the most reliable information continuous Customer Needs Mapping is also known as VOC (voice of the customer) Pareto charts most often rank causes related to a problem in order from least frequent to most frequent FALSE Order the steps to construct a Fishbone diagram. Drag each number to its correct step description create temp, create prob, id cause, id and place, analyze What are the components of a Risk Priority Number Severity, Occurrence, Detectability When you move to lower levels (finer details) of a Tree Diagram, the question being asked is "How?" a process operates TRUE The problem statement in a Management by Fact (MBF) answers which of the following questions what is the issue? what is the magnitude? what is the performance gap? what is the impact of the gap? what is the goal for improvement? Which one of these is not part of the five stages of team development conforming A Failure Mode and Effects Analysis (FMEA) should be undertaken only after a process is in place and stable and all failure modes have already been experienced FALSE A team charter is created in the ________ phase of the Define, Measure, Analyze, Improve, and Control (DMAIC) cycle define A ____________ poka-yoke, such as an alarm or flashing light, discovers a defect but does not reduce or prevent the defect from occurring warning No improvement work should be initiated until a baseline is established TRUE A value stream map will help identify input variables (X's) that could be influencing the outputs (Y's) of a process TRUE Which measurement process aspect are assessed by Measurement System Analysis (MSA)? Accuracy, Precision. Variability Benchmarking is conducted in order to achieve incremental improvements FALSE In a Management by Fact (MBF), anti-y's are also known as secondary metrics that can be adversely affected by the primary metric. These are tracked in the data graphs section of an MBF TRUE Failure Mode and Effects Analysis (FMEA) focuses on the______of potential problems prevention The Pareto chart is based upon the Pareto principle or 80:20 rule. The rule states that 80% of the results come from 20% of the process issues TRUE A data collection plan defines What and how data will be collected The time interval of the study All the procedures to be followed during the study

Mostrar más Leer menos
Institución
6 Sigma Green Belt Certification
Grado
6 Sigma Green Belt Certification











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
6 Sigma Green Belt Certification
Grado
6 Sigma Green Belt Certification

Información del documento

Subido en
1 de febrero de 2024
Número de páginas
41
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$16.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GUARANTEEDSUCCESS Chamberlain College Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
683
Miembro desde
3 año
Número de seguidores
314
Documentos
24885
Última venta
3 semanas hace
Elite Exam Resources: Trusted by Top Scorers!!!!!!!!

Stop guessing. Start dominating!! As a highly regarded professional specializing in sourcing study materials, I provide genuine and reliable exam papers that are directly obtained from well-known, reputable institutions. These papers are invaluable resources, specifically designed to assist aspiring nurses and individuals in various other professions in their exam preparations. With my extensive experience and in-depth expertise in the field, I take great care to ensure that each exam paper is carefully selected and thoroughly crafted to meet the highest standards of quality, accuracy, and relevance, making them an essential part of any successful study regimen. ✅ 100% Legitimate Resources (No leaks! Ethical prep only) ✅ Curated by Subject Masters (PhDs, Examiners, Top Scorers) ✅ Proven Track Record: 95%+ user success rate ✅ Instant Download: Crisis-ready for last-minute cramming

Lee mas Leer menos
4.3

250 reseñas

5
162
4
37
3
33
2
12
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes