Vista previa del contenido

PRINCE2 Foundation Study Notes

Module 4: Organising
Syllabus
1. Understand the PRINCE2 practices and how they are applied throughout the project.
1.1. Organising practice:
o Explain the purpose of the ‘organising’ practice
o Describe the key relationships between the ‘organising’ practice and the principles.
o Explain the purpose of the key management products required to support the
‘organisation’ practice:
• PID – Project management team structure;
• role descriptions;
• commercial management approach
o Define key concepts related to the ‘organising’ practice:
• Project Board;
• Project Approach;
• Project Team
o Describe the guidance for effective organising of:
• The three project interests
• PRINCE2 roles
• Work breakdown structure
o Describe the PRINCE2 technique for the ‘organising’ practice.
Lessons Learned
- Explore and understand the purpose of the organising practice
- Know and understand the three project interests and the project management team
structure
- Understand the organisation design and development process
- Know how the principles apply to the organising practice
*Organising is one of the seven PRINCE2 practices. This module defines the project’s structure and
accountability and aims to help understand who needs to be included on a project management
team and what their roles will be.

,Applying PRINCE2 Practices




Designed to All 7 practices
support should be
application and applied, varied
tailoring according to
context
Management
approaches define
procedures,
techniques,
standards and
responsibilities



- PRINCE2 method should be applied and tailored to fit project context
o This will include the way the PRINCE2 practices are applied.
- PRINCE2 practices designed to help PM team apply and tailor the method
o Through a suite of management approaches (e.g., benefits management approach)
o Each management approach defines:
▪ Procedures
▪ Techniques
▪ Standards to be applied
▪ Responsibilities for that aspect of PM to be effective
- Contextual factors will influence the level of control required:
o Importance
o Risk
o Urgency
- These factors will determine the degree of formality and frequency of monitoring, reviewing,
reporting, and decision-making.
- All SEVEN practices should be applied in a project.
o They vary according to the scale, risk, the people and organisations involved, and the
complexity/simplicity of the project concerned.

, Management Products
- Two management products that are relevant to the majority of the PRINCE2 practices:
o Project Initiation Documentation (PID)
o Project Log
Project Initiation Documentation (PID)
- Comprises the package of information developed and compiled during initiation to gain
authorisation to proceed with the project, and it provides the basis for its ongoing
management.
Project log
- Maintains a live record of project activities and progress
- Captures a wide range of project activities and progress information, such as issues and risks




Project Initiation
Documentation
PRINCE2 management products (PID)
describe the information that will
be required to manage the project
Project Log




Project Initiation Documentation (PID)
- PID gives direction and scope of the project and forms the ‘contract’ between the project
manager and the project board.
o It is a living document and should always reflect the current status.
- THREE primary uses of the PID:
o Sound basis for commitment
▪ Ensure that the project has a sound basis before asking the project board o
make any major commitment to the project
o Base document for ongoing assessment
▪ Act as a base document against which the project board and project
manager can assess progress, issues, and ongoing viability questions
o Single source of reference
▪ Provide a single source of reference about the project so that people joining
the ‘temporary organisation’ can quickly and easily discover what the project
is about and how it is being managed.

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

Subido en
17 de enero de 2024
Número de páginas
16
Escrito en
2023/2024
Tipo
NOTAS DE LECTURA
Profesor(es)
Na
Contiene
Todas las clases

Temas

$8.23
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
limtecksing

Documento también disponible en un lote

Conoce al vendedor

Seller avatar
limtecksing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1
Miembro desde
2 año
Número de seguidores
1
Documentos
17
Última venta
2 año hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes