100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

OSHA 30 Possible Exam Questions | 255 Questions with 100% Correct Answers | Verified | Latest Update 2024

Puntuación
-
Vendido
-
Páginas
22
Grado
A+
Subido en
14-01-2024
Escrito en
2023/2024

Those who work on a crane or near crane operations must be trained. Which of the following is true for this training? - D. All of the above Certain inspections of crane equipment may be made by a(n) ___________ person; however, crane inspections are typically required to be made by a(n) __________ person. - Competent, qualified After safety-related modifications have been made to crane equipment, the equipment must be inspected by __________ prior to use. - A qualified person Under OSHA construction requirements for crane and derricks, when a crane operator is employed by a company, who must pay for the crane operator's certification? - The crane operator's employer Inspection of hoists should include: - Both A & B (Hooks & Safety latches) Hoists shall be: - All of the above

Mostrar más Leer menos
Institución
OSHA 30
Grado
OSHA 30










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
OSHA 30
Grado
OSHA 30

Información del documento

Subido en
14 de enero de 2024
Número de páginas
22
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

OSHA 30 Possible Exam Questions | 255 Questions with 100% Correct Answers | Verified | Latest Update 2024 Those who work on a crane or near crane operations must be trained. Which of the following is true for this training? - ✔✔D. All of the above Certain inspections of crane equipment may be made by a(n) ___________ person; however, crane inspections are typically required to be made by a(n) __________ person. - ✔✔Competent, qualified After safety -related modifications have been made to crane equipment, the equipment must be inspected by __________ prior to use. - ✔✔A qualified person Under OSHA construction requirements for crane and derricks, when a crane operator is employed by a company, who must pay for the crane operator's certification? - ✔✔The crane operator's employer Inspection of hoists should include: - ✔✔Both A & B (Hooks & Safety latches) Hoists shall be: - ✔✔All of the above Daily inspections need to include: - ✔✔Checking of the wire rope for damage or "caging" Hoists shall be inspected: - ✔✔Daily, prior to use Do not perform maintenance on a conveyor until: - ✔✔All hazardous energies are disconnected and blocked Which crane has the ability to be "jacked -up" as needed? - ✔✔Tower Load charts must: - ✔✔Indicate rates lifting capacity and be visible to operator Standards for safety can be found in: - ✔✔29 CFR 1926 Subpart CC If a crane contacts a power line, the operator should normally stay in the cab until power has been de -
energized. - ✔✔True Above the heavy line crossing the load chart are values for failure in: - ✔✔Structure Cranes must maintain a minimum of ____ feet away from power lines: - ✔✔10' Each of the following is true for an operator who needs the leave a suddenly energized crane EXCEPT: - ✔✔Walk to safety in a zigzag pattern An annual inspection of each crane: - ✔✔All of the above What is the minimum distance allowed between a spoils pile and trench's edge? - ✔✔Two feet To be classified as Type A, the soil cannot be: - ✔✔All of the Above A cubic yard of soil can weigh as much as: - ✔✔A small pickup truck A soils are usually clays and cemented soils such as caliche and hardpan. - ✔✔True Each of the following is Type B soil EXCEPT: - ✔✔Sand Which of the following are common soil classification tests? - ✔✔All except C The definition of type C -60 soil is provided by manufacturers to allow the competent person an opportunity to use vertical shores or... - ✔✔True A defining feature of Stable Rock is that it will: - ✔✔Remain intact while exposed OSHA requires that the competent person perform two visual and two manual tests on a soil sample fresh out of the ground and not impacted by weather conditions at the site. - ✔✔False A soil cannot be Type A if it is: - ✔✔All of the above The most important distinction between Stable Rock/Types A&B and Type C is: - ✔✔Degrees of stability Which of the following statements is true of kickout? - ✔✔All of the above Mixed oak timbers have a greater bending strength per square inch than Douglas fir. - ✔✔False Type B soils afford afford how many options of protection? - ✔✔Four In type C soil, the angle of repose is very low; how many degrees must the angle be? - ✔✔34 degrees Which soil type is the most common? - ✔✔Type B Shores must be pumped to a minimum pf 750 pounds of pressure but more is recommended. - ✔✔True Aluminum hydraulic shoring permits both installation and removal without entering the trench - ✔✔True The struts of a screw jack system must be adjusted manually, which creates a hazard because the worker is required to: - ✔✔Be in the trench in order to adjust the strut
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ClassHero Rasmussen College
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
727
Miembro desde
2 año
Número de seguidores
396
Documentos
10234
Última venta
2 semanas hace

3.9

112 reseñas

5
59
4
15
3
21
2
4
1
13

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes