PJM Sample Test Review 150 Questions with 100% Verified Correct Answers
PJM Sample Test Review 150 Questions with 100% Verified Correct Answers Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - Correct Answer off cost out of merit. Monitoring ___________ may give insights into system constraints. - Correct Answer Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - Correct Answer PJM calls on synchronized reserves If not cancelled by PJM, the minimum generation alert expires at the end of the specified ______________. - Correct Answer light load period When PJM declares a hot weather alert, the generation dispatcher should determine if maintenance can be deferred and notify all generating stations and key personnel. - Correct Answer During system restoration, the two categories of reserves are dynamic and spinning. - Correct Answer During system restoration, frequency should be maintained between 59.75 and 61.00 Hertz. - Correct Answer PJM issues a heavy load voltage schedule. Member companies who own generation facilities should ensure voltage regulators on generating units are in service & automatic. - Correct Answer A unit being dispatched economically by PJM should set its megawatt output based on the unit's dispatch rate or desired megawatt level. - Correct Answer A fossil steam unit is considered fuel limited when it is not capable of running at its maximum capacity for the next 72 hours - Correct Answer During system restoration prior to synchronization of a unit, the dispatcher should ensure sufficient load is available to stabilize unit operation. - Correct Answer
Escuela, estudio y materia
- Institución
- PJM
- Grado
- PJM
Información del documento
- Subido en
- 11 de enero de 2024
- Número de páginas
- 15
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
real time transmission constraints or
-
monitoring may give insights into syst
-
pjm calls for reserves to recover ac
-
if not cancelled by pjm the minimum generation al
-
when pjm declares a hot weather al
Documento también disponible en un lote