PJM Generation Operation Exam 2024 Questions with Correct Answers
PJM Generation Operation Exam 2024 Questions with Correct Answers Control center facilities must have a minimum of how many days of fuel for the backup generator? - Correct Answer 5 days If PJM ACE shows overgeneration, actual imports are: - Correct Answer Less than scheduled Who should a generator contact at PJM to clear an outage ticket? - Correct Answer Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: - Correct Answer +/-.02 Hz What frequency would PJM set to correct for fast-time error? - Correct Answer 59.98Hz What frequency would PJM set to correct for slow-time error? - Correct Answer 60.02Hz What info is on an instantaneous reserve check? - Correct Answer synchronized (regulating and non-regulating), quick start, secondary and beyond secondary reserves Generators must provide PJM with a realistic Reactive Capability Curve. This curve must have no less than __ points, and no more than __ points. - Correct Answer No less than 2 and no more than 8 points A classic indicator of voltage instability is when system voltages change greatly when... - Correct Answer system loads change by a small amount Above the line of a D-curve... - Correct Answer Lagging (pushing VARs). Generators will be set there during high-load/low voltage conditions. Below the line of a D-curve... - Correct Answer Leading (absorbing VARs). Generators will be set there during low load/high voltage conditions.
Escuela, estudio y materia
- Institución
- PJM Generation Operation
- Grado
- PJM Generation Operation
Información del documento
- Subido en
- 11 de enero de 2024
- Número de páginas
- 7
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
what frequ
-
control center facilities must have a minimum of h
-
if pjm ace shows overgeneration actual imports ar
-
who should a generator contact at pjm to clea
-
to correct for a slow or fast clock system
Documento también disponible en un lote