PJM Generation Cert Exam Study Guide Questions with Correct Answers 100% Verified
PJM Generation Cert Exam Study Guide Questions with Correct Answers 100% Verified Actions in low voltage alert? - Correct Answer Review transmission & generation outages Request reactive reserve check Heavy load voltage schedule warning purpose is to have members prepare far max support of voltages on the? - Correct Answer Bulk Power System Manual load dump warning & reduction of Non-critical plant load issued when? - Correct Answer Primary reserve is less the the largest generating unit. Loss of transmission facility jeopardize reliability after all possible measures have been taken to increase reserves Hot weather alert - Correct Answer COMED 90 DOM & EKPC 95 PJM issues high system voltage message - Correct Answer Gen operators should operate the lower end of their voltage bandwidth Primary reserve warning - Correct Answer Ensure deffer able Maintenance is halted General actions PJM takes when conservating ops initiated? - Correct Answer Purchase/load additional reserves begin studying double contingencies Lower IROL Increase # of SOS calls Purpose of heavy voltage schedule action is to increase reactive reserves - Correct Answer EHV system National terrorism advisory system 2 types of alerts? - Correct Answer Elevated threat Imminent threat
Escuela, estudio y materia
- Institución
- PJM Generation
- Grado
- PJM Generation
Información del documento
- Subido en
- 11 de enero de 2024
- Número de páginas
- 24
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
hot weather alert
-
actions in low voltage alert
-
heavy load voltage schedule warning purpose is to
-
manual load dump warning reduction of non critic
-
pjm issues high system voltage message
Documento también disponible en un lote